Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2022 |
Principal Product | Machining |
NAICS | 332710 - Machine Shops |
SIC | 3599 - Industrial Machinery, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 22,500 |
Annual Production | 125,500 Units |
Production Hrs. Annual | 6,240 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $41,706 | 1,062,581 | kWh | $0.04 |
Electricity Demand | $17,162 | 2,349 | kW-months/year | $7.31 |
Electricity Fees | $13,799 | - | $ | - |
Natural Gas | $3,872 | 503 | MMBtu | $7.70 |
TOTAL ENERGY COSTS | $78,667 | |||
RECOMMENDED SAVINGS* | $15,462 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,955 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $633 Cost: - |
$504 | 12,839 | $129 | 18 | - | - | - | - |
$504 12,839 kWh |
$129 18 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,185 Cost: $2,250 |
$428 | 10,905 | $1,757 | 240 | - | - | - | - |
$428 10,905 kWh |
$1,757 240 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $555 Cost: $676 |
$442 | 11,251 | $113 | 15 | - | - | - | - |
$442 11,251 kWh |
$113 15 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,955 Cost: $6,000 |
$3,875 | 98,736 | $1,326 | 181 | $431 | - | $323 | - |
$3,875 98,736 kWh |
$1,326 181 kW-months/year |
$431 - $ |
$323 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,775 Cost: $800 |
$1,147 | 29,213 | $867 | 118 | $609 | - | $152 | - |
$1,147 29,213 kWh |
$867 118 kW-months/year |
$609 - $ |
$152 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $3,359 Cost: $4,615 |
$3,359 | 85,574 | - | - | - | - | - | - |
$3,359 85,574 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,462 Cost: $14,341 |
$9,755 | 248,518 | $4,192 | 572 | $1,040 | - | $475 | - | $9,755 248,518 kWh |
$4,192 572 kW-months/year |
$1,040 - $ |
$475 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,955 Cost: $6,000 |
$3,875 | 98,736 | $1,326 | 181 | $431 | - | $323 | - | $3,875 98,736 kWh |
$1,326 181 kW-months/year |
$431 - $ |
$323 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Personnel Changes | Primary Raw Material |