IAC logo
IAC Assessment: UD1038
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1038
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2022
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 180
Plant Area (Sq.Ft.) 170,000
Annual Production 1,000 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $591,706 11,741,214 kWh $0.05
Electricity Demand $147,629 20,148 kW-months/year $7.33
Electricity Fees $309 - $ -
Natural Gas $344,214 80,202 MMBtu $4.29
TOTAL ENERGY COSTS $1,083,858
RECOMMENDED SAVINGS* $90,960 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,683
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,646
Cost:
$1,000
$5,152 108,916 $1,094 149 - - $(-600) - - - $5,152
108,916
kWh
$1,094
149
kW-months/year
-
-
MMBtu
$(-600)
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$34,366
Cost:
$30,000
- - - - $34,366 7,992 - - - - -
-
kWh
-
-
kW-months/year
$34,366
7,992
MMBtu
-
-
$
-
-
$
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$2,702
Cost:
$1,750
- - - - $2,702 628 - - - - -
-
kWh
-
-
kW-months/year
$2,702
628
MMBtu
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,730
Cost:
-
$1,730 36,577 - - - - - - - - $1,730
36,577
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$26,728
Cost:
$32,000
- - - - $26,728 6,216 - - - - -
-
kWh
-
-
kW-months/year
$26,728
6,216
MMBtu
-
-
$
-
-
$
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,751
Cost:
-
- - - - $5,751 1,337 - - - - -
-
kWh
-
-
kW-months/year
$5,751
1,337
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,037
Cost:
$29,375
$9,298 196,574 $1,974 269 - - $1,828 - $937 - $9,298
196,574
kWh
$1,974
269
kW-months/year
-
-
MMBtu
$1,828
-
$
$937
-
$
TOTAL RECOMMENDED Savings:
$90,960
Cost:
$94,125
$16,180 342,067 $3,068 418 $69,547 16,173 $1,228 - $937 - $16,180
342,067
kWh
$3,068
418
kW-months/year
$69,547
16,173
MMBtu
$1,228
-
$
$937
-
$
TOTAL IMPLEMENTED Savings:
$19,683
Cost:
$30,375
$14,450 305,490 $3,068 418 - - $1,228 - $937 - $14,450
305,490
kWh
$3,068
418
kW-months/year
-
-
MMBtu
$1,228
-
$
$937
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost