IAC Assessment: UD1044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2022
Principal Product Aeronautical Systems and Instrumentation
NAICS 334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812 - Search And Navigation Equipment
Sales $100,000,000-$500,000,000
# of Employees 185
Plant Area (Sq.Ft.) 44,000
Annual Production 1 Units
Production Hrs. Annual 2,800
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $442,394 7,460,264 kWh $0.06
Electricity Demand $121,265 16,548 kW-months/year $7.33
Electricity Fees $309 - $ -
Natural Gas $22,832 2,792 MMBtu $8.18
TOTAL ENERGY COSTS $597,152
RECOMMENDED SAVINGS* $15,767 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $318
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
01: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$4,822
Cost:
-
- - - - - - $4,822 409 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,822
409
Tgal
-
-
$
-
-
$
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$704
Cost:
-
$602 10,128 $102 14 - - - - - - - - $602
10,128
kWh
$102
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$6,187
Cost:
$750
$5,292 89,089 $895 122 - - - - - - - - $5,292
89,089
kWh
$895
122
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$318
Cost:
-
$86 1,454 - - $232 28 - - - - - - $86
1,454
kWh
-
-
kW-months/year
$232
28
MMBtu
-
-
Tgal
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,611
Cost:
$900
$798 13,440 $141 19 - - - - $134 - $538 - $798
13,440
kWh
$141
19
kW-months/year
-
-
MMBtu
-
-
Tgal
$134
-
$
$538
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,125
Cost:
$2,940
$1,557 26,206 $528 72 - - - - $40 - - - $1,557
26,206
kWh
$528
72
kW-months/year
-
-
MMBtu
-
-
Tgal
$40
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,767
Cost:
$4,590
$8,335 140,317 $1,666 227 $232 28 $4,822 409 $174 - $538 - $8,335
140,317
kWh
$1,666
227
kW-months/year
$232
28
MMBtu
$4,822
409
Tgal
$174
-
$
$538
-
$
TOTAL IMPLEMENTED Savings:
$318
Cost:
-
$86 1,454 - - $232 28 - - - - - - $86
1,454
kWh
-
-
kW-months/year
$232
28
MMBtu
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes Ancillary Material Cost