IAC logo
IAC Assessment: UD1048
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1048
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2022
Principal Product Insulated Metal Panels
NAICS 332311 - Prefabricated Metal Building and Component Manufacturing
SIC 3448 - Prefabricated Metal Buildings
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 150,000
Annual Production 121,633 Units
Production Hrs. Annual 4,368
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,599 925,920 kWh $0.09
Electricity Demand $19,474 2,782 kW-months/year $7.00
Electricity Fees $113 - $ -
Natural Gas $23,976 2,449 MMBtu $9.79
LPG $22,726 40 MMBtu $568.15
TOTAL ENERGY COSTS $157,749
RECOMMENDED SAVINGS* $30,797 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,787
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$15,150
Cost:
$1,500
- - - - $15,150 1,496 - - -
-
kWh
-
-
kW-months/year
$15,150
1,496
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,915
Cost:
$625
$1,026 11,794 $227 32 - - $662 - $1,026
11,794
kWh
$227
32
kW-months/year
-
-
MMBtu
$662
-
$
03: 2.7122 DISCONNECT BALLASTS Savings:
$1,787
Cost:
-
$1,398 16,074 $310 44 - - $79 - $1,398
16,074
kWh
$310
44
kW-months/year
-
-
MMBtu
$79
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,481
Cost:
$35
$4,481 51,505 - - - - - - $4,481
51,505
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,115
Cost:
$1,409
$4,115 47,302 - - - - - - $4,115
47,302
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,737
Cost:
$952
$1,564 17,982 $173 25 - - - - $1,564
17,982
kWh
$173
25
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,039
Cost:
-
$936 10,760 $103 15 - - - - $936
10,760
kWh
$103
15
kW-months/year
-
-
MMBtu
-
-
$
08: 2.6226 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE Savings:
$573
Cost:
$1,065
$469 5,396 $104 15 - - - - $469
5,396
kWh
$104
15
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$30,797
Cost:
$5,586
$13,989 160,813 $917 131 $15,150 1,496 $741 - $13,989
160,813
kWh
$917
131
kW-months/year
$15,150
1,496
MMBtu
$741
-
$
TOTAL IMPLEMENTED Savings:
$1,787
Cost:
-
$1,398 16,074 $310 44 - - $79 - $1,398
16,074
kWh
$310
44
kW-months/year
-
-
MMBtu
$79
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes