Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2023 |
Principal Product | Conductive Polymers |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 75 |
Plant Area (Sq.Ft.) | 41,000 |
Annual Production | 920,430 Pounds |
Production Hrs. Annual | 3,750 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $354,405 | 4,769,146 | kWh | $0.07 |
Electricity Demand | $64,790 | 9,864 | kW-months/year | $6.57 |
Electricity Fees | $1,407 | - | $ | - |
Natural Gas | $97,783 | 15,462 | MMBtu | $6.32 |
TOTAL ENERGY COSTS | $520,164 | |||
RECOMMENDED SAVINGS* | $120,986 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $103,774 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,474 Cost: $250 |
$3,099 | 41,713 | $375 | 57 | - | - | - | - | - | - |
$3,099 41,713 kWh |
$375 57 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,573 Cost: - |
$2,295 | 30,889 | $278 | 42 | - | - | - | - | - | - |
$2,295 30,889 kWh |
$278 42 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,193 Cost: - |
$1,053 | 14,179 | $140 | 21 | - | - | - | - | - | - |
$1,053 14,179 kWh |
$140 21 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $36,442 Cost: - |
$33,205 | 446,906 | $612 | 93 | $2,625 | 415 | - | - | - | - |
$33,205 446,906 kWh |
$612 93 kW-months/year |
$2,625 415 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $17,114 Cost: $3,100 |
$15,265 | 205,457 | $1,849 | 281 | - | - | - | - | - | - |
$15,265 205,457 kWh |
$1,849 281 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,784 Cost: - |
- | - | - | - | $3,784 | 599 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,784 599 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $7,938 Cost: $800 |
- | - | - | - | $7,938 | 1,256 | - | - | - | - |
- - kWh |
- - kW-months/year |
$7,938 1,256 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $23,824 Cost: - |
$12,637 | 170,085 | $3,576 | 545 | - | - | $2,918 | - | $4,693 | - |
$12,637 170,085 kWh |
$3,576 545 kW-months/year |
- - MMBtu |
$2,918 - $ |
$4,693 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $7,204 Cost: $1,800 |
$7,136 | 96,048 | - | - | - | - | - | - | $68 | - |
$7,136 96,048 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
$68 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,229 Cost: - |
$655 | 8,813 | $185 | 28 | - | - | $109 | - | $280 | - |
$655 8,813 kWh |
$185 28 kW-months/year |
- - MMBtu |
$109 - $ |
$280 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $228 Cost: $368 |
- | - | - | - | $228 | 36 | - | - | - | - |
- - kWh |
- - kW-months/year |
$228 36 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $15,983 Cost: $148,109 |
$13,990 | 188,293 | $1,993 | 303 | - | - | - | - | - | - |
$13,990 188,293 kWh |
$1,993 303 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $120,986 Cost: $154,427 |
$89,335 | 1,202,383 | $9,008 | 1,371 | $14,575 | 2,306 | $3,027 | - | $5,041 | - | $89,335 1,202,383 kWh |
$9,008 1,371 kW-months/year |
$14,575 2,306 MMBtu |
$3,027 - $ |
$5,041 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $103,774 Cost: $6,318 |
$74,690 | 1,005,277 | $6,830 | 1,040 | $14,575 | 2,306 | $2,918 | - | $4,761 | - | $74,690 1,005,277 kWh |
$6,830 1,040 kW-months/year |
$14,575 2,306 MMBtu |
$2,918 - $ |
$4,761 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Administrative Changes |