IAC logo
IAC Assessment: UD1060
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1060
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Vehicle Engines
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 100,000
Annual Production 12,400 Units
Production Hrs. Annual 2,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $51,827 735,438 kWh $0.07
Electricity Demand $21,663 3,819 kW-months/year $5.67
Electricity Fees $553 - $ -
Natural Gas $18,917 2,709 MMBtu $6.98
TOTAL ENERGY COSTS $98,122
RECOMMENDED SAVINGS* $13,950 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,983
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$139
Cost:
-
$112 1,585 $27 5 - - - - - - - - $112
1,585
kWh
$27
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,987
Cost:
$912
$1,031 14,547 - - - - $2,956 424 - - - - $1,031
14,547
kWh
-
-
kW-months/year
-
-
$
$2,956
424
MMBtu
-
-
$
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,251
Cost:
$772
$31 434 $2,220 391 - - - - - - - - $31
434
kWh
$2,220
391
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$653
Cost:
-
$450 6,343 $203 36 - - - - - - - - $450
6,343
kWh
$203
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$300
Cost:
$952
$202 2,870 $98 17 - - - - - - - - $202
2,870
kWh
$98
17
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,184
Cost:
$2,800
- - - - $2,184 - - - - - - - -
-
kWh
-
-
kW-months/year
$2,184
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$892
Cost:
$1,613
$892 12,656 - - - - - - - - - - $892
12,656
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,544
Cost:
$17,274
$1,473 20,888 $711 125 - - - - $476 - $884 - $1,473
20,888
kWh
$711
125
kW-months/year
-
-
$
-
-
MMBtu
$476
-
$
$884
-
$
TOTAL RECOMMENDED Savings:
$13,950
Cost:
$24,323
$4,191 59,323 $3,259 574 $2,184 - $2,956 424 $476 - $884 - $4,191
59,323
kWh
$3,259
574
kW-months/year
$2,184
-
$
$2,956
424
MMBtu
$476
-
$
$884
-
$
TOTAL IMPLEMENTED Savings:
$3,983
Cost:
$18,226
$1,787 25,343 $836 147 - - - - $476 - $884 - $1,787
25,343
kWh
$836
147
kW-months/year
-
-
$
-
-
MMBtu
$476
-
$
$884
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost