IAC logo
IAC Assessment: UD1062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Polymer Sealants
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 33,000
Annual Production 27,400,000 Units
Production Hrs. Annual 6,240
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,103 2,235,415 kWh $0.05
Electricity Demand $40,941 6,208 kW-months/year $6.59
Electricity Fees $346 - $ -
Natural Gas $27,157 1,841 MMBtu $14.75
TOTAL ENERGY COSTS $182,871
RECOMMENDED SAVINGS* $10,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,152
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,907
Cost:
-
$4,674 97,182 $1,233 187 - - - - $4,674
97,182
kWh
$1,233
187
kW-months/year
-
-
Tgal
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,486
Cost:
-
- - $1,486 225 - - - - -
-
kWh
$1,486
225
kW-months/year
-
-
Tgal
-
-
$
03: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$705
Cost:
$260
- - - - $705 120 - - -
-
kWh
-
-
kW-months/year
$705
120
Tgal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$727
Cost:
$952
$575 11,966 $152 23 - - - - $575
11,966
kWh
$152
23
kW-months/year
-
-
Tgal
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$342
Cost:
-
$271 5,634 $71 11 - - - - $271
5,634
kWh
$71
11
kW-months/year
-
-
Tgal
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,152
Cost:
$2,000
$619 12,867 - - - - $533 - $619
12,867
kWh
-
-
kW-months/year
-
-
Tgal
$533
-
$
TOTAL RECOMMENDED Savings:
$10,319
Cost:
$3,212
$6,139 127,649 $2,942 446 $705 120 $533 - $6,139
127,649
kWh
$2,942
446
kW-months/year
$705
120
Tgal
$533
-
$
TOTAL IMPLEMENTED Savings:
$1,152
Cost:
$2,000
$619 12,867 - - - - $533 - $619
12,867
kWh
-
-
kW-months/year
-
-
Tgal
$533
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes