Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Dayton |
---|---|
Assessment Year | 2023 |
Principal Product | Thermoplastic polymers and resins |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $5,000,000-$10,000,000 |
# of Employees | 7 |
Plant Area (Sq.Ft.) | 60,000 |
Annual Production | 2,648,581 Units |
Production Hrs. Annual | 2,210 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $107,652 | 1,205,750 | kWh | $0.09 |
Electricity Demand | $37,367 | 5,670 | kW-months/year | $6.59 |
Electricity Fees | $7,997 | - | $ | - |
Natural Gas | $7,338 | 634 | MMBtu | $11.57 |
TOTAL ENERGY COSTS | $160,785 | |||
RECOMMENDED SAVINGS* | $12,057 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,244 Cost: $297 |
$460 | 5,155 | $784 | 119 | - | - | - | - | - | - |
$460 5,155 kWh |
$784 119 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $760 Cost: - |
$543 | 6,071 | $217 | 33 | - | - | - | - | - | - |
$543 6,071 kWh |
$217 33 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $461 Cost: $952 |
$329 | 3,686 | $132 | 20 | - | - | - | - | - | - |
$329 3,686 kWh |
$132 20 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4113 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS |
Savings: $4,227 Cost: $2,191 |
$3,018 | 33,792 | $1,209 | 184 | - | - | - | - | - | - |
$3,018 33,792 kWh |
$1,209 184 kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,201 Cost: $2,583 |
$631 | 7,068 | $253 | 38 | - | - | $72 | - | $245 | - |
$631 7,068 kWh |
$253 38 kW-months/year |
- - $ |
$72 - $ |
$245 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $170 Cost: $200 |
$140 | 1,567 | - | - | - | - | $30 | - | - | - |
$140 1,567 kWh |
- - kW-months/year |
- - $ |
$30 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,994 Cost: $10,500 |
- | - | - | - | $3,994 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,994 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $12,057 Cost: $16,723 |
$5,121 | 57,339 | $2,595 | 394 | $3,994 | - | $102 | - | $245 | - | $5,121 57,339 kWh |
$2,595 394 kW-months/year |
$3,994 - $ |
$102 - $ |
$245 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Personnel Changes | Ancillary Material Cost |