IAC logo
IAC Assessment: UD1064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2023
Principal Product Ink
NAICS 325910 - Printing Ink Manufacturing
SIC 2893 - Printing Ink
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 70,000
Annual Production 36,090,617 Pounds
Production Hrs. Annual 3,900
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $74,179 1,164,451 kWh $0.06
Electricity Demand $21,542 3,798 kW-months/year $5.67
Electricity Fees $1,500 - $ -
Natural Gas $58,699 7,430 MMBtu $7.90
TOTAL ENERGY COSTS $156,478
RECOMMENDED SAVINGS* $29,032 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,680
Cost:
-
$1,680 26,373 - - - - - - $1,680
26,373
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$754
Cost:
-
$442 6,945 $312 55 - - - - $442
6,945
kWh
$312
55
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,422
Cost:
$13,970
$7,172 112,597 $2,312 408 - - $5,938 - $7,172
112,597
kWh
$2,312
408
kW-months/year
-
-
MMBtu
$5,938
-
$
04: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$914
Cost:
$4,215
- - - - $914 116 - - -
-
kWh
-
-
kW-months/year
$914
116
MMBtu
-
-
$
05: 2.7291 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS Savings:
$1,632
Cost:
-
$2,829 44,412 - - $(-1,197) (-152) - - $2,829
44,412
kWh
-
-
kW-months/year
$(-1,197)
(-152)
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,630
Cost:
$32,000
$5,593 87,389 $1,525 269 $1,512 192 - - $5,593
87,389
kWh
$1,525
269
kW-months/year
$1,512
192
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$29,032
Cost:
$50,185
$17,716 277,716 $4,149 732 $1,229 156 $5,938 - $17,716
277,716
kWh
$4,149
732
kW-months/year
$1,229
156
MMBtu
$5,938
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes