IAC logo
IAC Assessment: UD1111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product Cookies, etc
NAICS 311821 - Cookie and Cracker Manufacturing
SIC 2052 - Cookies And Crackers
Sales $100,000,000-$500,000,000
# of Employees 298
Plant Area (Sq.Ft.) 86,000
Annual Production 79,070,834 Units
Production Hrs. Annual 8,760
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,511 3,370,430 kWh $0.08
Electricity Demand $92,145 6,993 kW-months/year $13.18
Electricity Fees $7,000 - $ -
Natural Gas $67,753 9,365 MMBtu $7.23
TOTAL ENERGY COSTS $477,590
RECOMMENDED SAVINGS* $54,071 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
01: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$38,544
Cost:
$2,352
$8,971 116,509 - - $9,381 2,166 $20,192 2,166 - - - - $8,971
116,509
kWh
-
-
kW-months/year
$9,381
2,166
Tgal
$20,192
2,166
Tgal
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$216
Cost:
-
$175 2,273 $41 3 - - - - - - - - $175
2,273
kWh
$41
3
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,758
Cost:
$10,506
$6,604 85,766 $1,698 129 - - - - $1,978 - $478 - $6,604
85,766
kWh
$1,698
129
kW-months/year
-
-
Tgal
-
-
Tgal
$1,978
-
$
$478
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$621
Cost:
$782
$296 3,838 $283 22 - - - - $30 - $12 - $296
3,838
kWh
$283
22
kW-months/year
-
-
Tgal
-
-
Tgal
$30
-
$
$12
-
$
05: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,836
Cost:
$2,500
- - - - - - $1,836 197 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,836
197
Tgal
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,406
Cost:
$2,030
$1,137 14,761 $269 21 - - - - - - - - $1,137
14,761
kWh
$269
21
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$690
Cost:
$953
$559 7,261 $131 10 - - - - - - - - $559
7,261
kWh
$131
10
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$54,071
Cost:
$19,123
$17,742 230,408 $2,422 184 $9,381 2,166 $22,028 2,363 $2,008 - $490 - $17,742
230,408
kWh
$2,422
184
kW-months/year
$9,381
2,166
Tgal
$22,028
2,363
Tgal
$2,008
-
$
$490
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Ancillary Material Cost