IAC logo
IAC Assessment: UD1112
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD1112
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2025
Principal Product Food storage and distribution
NAICS 493120 - Refrigerated Warehousing and Storage
SIC 4222 - Refrigerated Warehousing And Storage
Sales <$500,000
# of Employees 282
Plant Area (Sq.Ft.) 330,000
Annual Production 1 Units
Production Hrs. Annual 2,080
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $842,070 9,989,515 kWh $0.08
Electricity Fees $1,629 - $ -
Natural Gas $85,353 10,986 MMBtu $7.77
TOTAL ENERGY COSTS $929,052
RECOMMENDED SAVINGS* $287,855 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$919
Cost:
$18,000
$919 10,945 - - - - $919
10,945
kWh
-
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,080
Cost:
$15,600
$16,080 191,428 - - - - $16,080
191,428
kWh
-
-
$
-
-
MMBtu
03: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$115,397
Cost:
$2,116,590
$115,397 1,373,768 - - - - $115,397
1,373,768
kWh
-
-
$
-
-
MMBtu
04: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$215
Cost:
$150
$215 2,555 - - - - $215
2,555
kWh
-
-
$
-
-
MMBtu
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$43,286
Cost:
$60,000
$23,155 275,656 - - $20,131 2,581 $23,155
275,656
kWh
-
-
$
$20,131
2,581
MMBtu
06: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$110,329
Cost:
$50,000
$110,329 1,313,441 - - - - $110,329
1,313,441
kWh
-
-
$
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,161
Cost:
$15,790
- - $1,161 - - - -
-
kWh
$1,161
-
$
-
-
MMBtu
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$468
Cost:
$5,674
- - $468 - - - -
-
kWh
$468
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$287,855
Cost:
$2,281,804
$266,095 3,167,793 $1,629 - $20,131 2,581 $266,095
3,167,793
kWh
$1,629
-
$
$20,131
2,581
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas