IAC logo
IAC Assessment: UF0117
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0117
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1995
Principal Product Industrial Fuse Assemblies
NAICS n/a
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $50,000,000-$100,000,000
# of Employees 72
Plant Area (Sq.Ft.) 90,000
Annual Production 1,667,000 Pieces
Production Hrs. Annual 2,184
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,315 1,510,551 kWh $0.07
TOTAL ENERGY COSTS $111,315
RECOMMENDED SAVINGS* $30,796 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,571
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,482
Cost:
-
$3,482 58,910 $3,482
58,910
kWh
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,283
Cost:
$1,280
$3,283 71,219 $3,283
71,219
kWh
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,613
Cost:
$6,990
$3,613 53,634 $3,613
53,634
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$763
Cost:
$1,160
$763 10,844 $763
10,844
kWh
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$19,074
Cost:
$31,700
$19,074 254,689 $19,074
254,689
kWh
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$326
Cost:
$100
$326 4,396 $326
4,396
kWh
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$255
Cost:
-
$255 3,517 $255
3,517
kWh
TOTAL RECOMMENDED Savings:
$30,796
Cost:
$41,230
$30,796 457,209 $30,796
457,209
kWh
TOTAL IMPLEMENTED Savings:
$4,571
Cost:
$1,260
$4,571 74,150 $4,571
74,150
kWh