Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1996 |
Principal Product | Intraocular lens |
NAICS | n/a |
SIC | 3851 - Ophthalmic Goods |
Sales | $50,000,000-$100,000,000 |
# of Employees | 190 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 400,000 Pieces |
Production Hrs. Annual | 3,640 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $383,839 | 6,401,817 | kWh | $0.06 |
Electricity Demand | $52,580 | 11,840 | kW-months/year | $4.44 |
TOTAL ENERGY COSTS | $436,419 | |||
RECOMMENDED SAVINGS* | $86,728 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $36,208 |
#|Description |
Savings Cost |
Status | Electricity Usage | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Administrative Changes | Ancillary Material Cost | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $21,085 Cost: $5,000 |
$21,085 | 405,334 | - | - | - | - | - | - |
$21,085 405,334 kWh |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,664 Cost: $350 |
$3,664 | 60,961 | - | - | - | - | - | - |
$3,664 60,961 kWh |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,358 Cost: $34,340 |
$25,358 | 487,691 | - | - | - | - | - | - |
$25,358 487,691 kWh |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,176 Cost: $14,000 |
$9,176 | 176,436 | - | - | - | - | - | - |
$9,176 176,436 kWh |
- - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $600 Cost: - |
- | - | $600 | - | - | - | - | - |
- - kWh |
$600 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $21,580 Cost: - |
- | - | - | - | $21,580 | - | - | - |
- - kWh |
- - $ |
$21,580 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.4151 MINIMIZE WATER USAGE |
Savings: $3,477 Cost: $3,400 |
- | - | - | - | - | - | $3,477 | - |
- - kWh |
- - $ |
- - $ |
$3,477 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4155 METER WASTE WATER |
Savings: $1,788 Cost: $2,000 |
- | - | $1,788 | - | - | - | - | - |
- - kWh |
$1,788 - $ |
- - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,728 Cost: $59,090 |
$59,283 | 1,130,422 | $2,388 | - | $21,580 | - | $3,477 | - | $59,283 1,130,422 kWh |
$2,388 - $ |
$21,580 - $ |
$3,477 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $36,208 Cost: $16,350 |
$12,840 | 237,397 | $1,788 | - | $21,580 | - | - | - | $12,840 237,397 kWh |
$1,788 - $ |
$21,580 - $ |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Administrative Changes | Ancillary Material Cost | Water Consumption | Electricity Usage | Administrative Changes | Ancillary Material Cost | Water Consumption |