IAC logo
IAC Assessment: UF0137
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0137
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Intraocular lens
NAICS n/a
SIC 3851 - Ophthalmic Goods
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 100,000
Annual Production 400,000 Pieces
Production Hrs. Annual 3,640
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $383,839 6,401,817 kWh $0.06
Electricity Demand $52,580 11,840 kW-months/year $4.44
TOTAL ENERGY COSTS $436,419
RECOMMENDED SAVINGS* $86,728 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,208
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ $ $ $ $ Tgal
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$21,085
Cost:
$5,000
$21,085 405,334 - - - - - - $21,085
405,334
kWh
-
-
$
-
-
$
-
-
Tgal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,664
Cost:
$350
$3,664 60,961 - - - - - - $3,664
60,961
kWh
-
-
$
-
-
$
-
-
Tgal
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,358
Cost:
$34,340
$25,358 487,691 - - - - - - $25,358
487,691
kWh
-
-
$
-
-
$
-
-
Tgal
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,176
Cost:
$14,000
$9,176 176,436 - - - - - - $9,176
176,436
kWh
-
-
$
-
-
$
-
-
Tgal
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$600
Cost:
-
- - $600 - - - - - -
-
kWh
$600
-
$
-
-
$
-
-
Tgal
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$21,580
Cost:
-
- - - - $21,580 - - - -
-
kWh
-
-
$
$21,580
-
$
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$3,477
Cost:
$3,400
- - - - - - $3,477 - -
-
kWh
-
-
$
-
-
$
$3,477
-
Tgal
08: 3.4155 METER WASTE WATER Savings:
$1,788
Cost:
$2,000
- - $1,788 - - - - - -
-
kWh
$1,788
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$86,728
Cost:
$59,090
$59,283 1,130,422 $2,388 - $21,580 - $3,477 - $59,283
1,130,422
kWh
$2,388
-
$
$21,580
-
$
$3,477
-
Tgal
TOTAL IMPLEMENTED Savings:
$36,208
Cost:
$16,350
$12,840 237,397 $1,788 - $21,580 - - - $12,840
237,397
kWh
$1,788
-
$
$21,580
-
$
-
-
Tgal
Savings
Cost
$ kWh $ $ $ $ $ Tgal
Electricity Usage Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Administrative Changes Ancillary Material Cost Water Consumption