IAC logo
IAC Assessment: UF0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Salty snacks
NAICS n/a
SIC 2096 - Potato Chips And Similar Snacks
Sales $10,000,000-$50,000,000
# of Employees 95
Plant Area (Sq.Ft.) 108,000
Annual Production 1,600,000 Pieces
Production Hrs. Annual 2,600
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $276,720 5,302,755 kWh $0.05
Electricity Demand $55,414 12,299 kW-months/year $4.51
Natural Gas $183,942 37,297 MMBtu $4.93
TOTAL ENERGY COSTS $516,076
RECOMMENDED SAVINGS* $155,306 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $95,584
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$75,430
Cost:
-
- - - - $75,430 - - - -
-
kWh
-
-
kW-months/year
$75,430
-
$
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$18,648
Cost:
-
- - - - - - $18,648 - -
-
kWh
-
-
kW-months/year
-
-
$
$18,648
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,180
Cost:
$11,068
$3,526 83,822 $654 277 - - - - $3,526
83,822
kWh
$654
277
kW-months/year
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$24,372
Cost:
$57,360
$24,372 580,305 - - - - - - $24,372
580,305
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,506
Cost:
$350
$1,506 30,774 - - - - - - $1,506
30,774
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$16,271
Cost:
$35,000
$15,577 370,750 $694 294 - - - - $15,577
370,750
kWh
$694
294
kW-months/year
-
-
$
-
-
$
07: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS Savings:
$1,581
Cost:
$1,125
$1,581 37,515 - - - - - - $1,581
37,515
kWh
-
-
kW-months/year
-
-
$
-
-
$
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,118
Cost:
$10,800
$6,118 363,716 - - - - - - $6,118
363,716
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$7,200
Cost:
-
- - - - - - $7,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$7,200
-
$
TOTAL RECOMMENDED Savings:
$155,306
Cost:
$115,703
$52,680 1,466,882 $1,348 571 $75,430 - $25,848 - $52,680
1,466,882
kWh
$1,348
571
kW-months/year
$75,430
-
$
$25,848
-
$
TOTAL IMPLEMENTED Savings:
$95,584
Cost:
$350
$1,506 30,774 - - $75,430 - $18,648 - $1,506
30,774
kWh
-
-
kW-months/year
$75,430
-
$
$18,648
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes