Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1996 |
Principal Product | Salty snacks |
NAICS | n/a |
SIC | 2096 - Potato Chips And Similar Snacks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 95 |
Plant Area (Sq.Ft.) | 108,000 |
Annual Production | 1,600,000 Pieces |
Production Hrs. Annual | 2,600 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $276,720 | 5,302,755 | kWh | $0.05 |
Electricity Demand | $55,414 | 12,299 | kW-months/year | $4.51 |
Natural Gas | $183,942 | 37,297 | MMBtu | $4.93 |
TOTAL ENERGY COSTS | $516,076 | |||
RECOMMENDED SAVINGS* | $155,306 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $95,584 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $75,430 Cost: - |
- | - | - | - | $75,430 | - | - | - |
- - kWh |
- - kW-months/year |
$75,430 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER |
Savings: $18,648 Cost: - |
- | - | - | - | - | - | $18,648 | - |
- - kWh |
- - kW-months/year |
- - $ |
$18,648 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,180 Cost: $11,068 |
$3,526 | 83,822 | $654 | 277 | - | - | - | - |
$3,526 83,822 kWh |
$654 277 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $24,372 Cost: $57,360 |
$24,372 | 580,305 | - | - | - | - | - | - |
$24,372 580,305 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,506 Cost: $350 |
$1,506 | 30,774 | - | - | - | - | - | - |
$1,506 30,774 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $16,271 Cost: $35,000 |
$15,577 | 370,750 | $694 | 294 | - | - | - | - |
$15,577 370,750 kWh |
$694 294 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7212 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS |
Savings: $1,581 Cost: $1,125 |
$1,581 | 37,515 | - | - | - | - | - | - |
$1,581 37,515 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,118 Cost: $10,800 |
$6,118 | 363,716 | - | - | - | - | - | - |
$6,118 363,716 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $7,200 Cost: - |
- | - | - | - | - | - | $7,200 | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,200 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $155,306 Cost: $115,703 |
$52,680 | 1,466,882 | $1,348 | 571 | $75,430 | - | $25,848 | - | $52,680 1,466,882 kWh |
$1,348 571 kW-months/year |
$75,430 - $ |
$25,848 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $95,584 Cost: $350 |
$1,506 | 30,774 | - | - | $75,430 | - | $18,648 | - | $1,506 30,774 kWh |
- - kW-months/year |
$75,430 - $ |
$18,648 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Administrative Changes |