IAC logo
IAC Assessment: UF0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Aluminum Pipe
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 85,000
Annual Production 1,500,000 Pounds
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,373 1,431,125 kWh $0.06
Electricity Demand $16,941 4,068 kW-months/year $4.16
TOTAL ENERGY COSTS $102,314
RECOMMENDED SAVINGS* $33,992 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,491
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,558
Cost:
$334
$1,907 32,239 $651 156 - - - - $1,907
32,239
kWh
$651
156
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$578
Cost:
-
$420 7,034 $158 38 - - - - $420
7,034
kWh
$158
38
kW-months/year
-
-
MMBtu
-
-
$
03: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$1,865
Cost:
$2,300
$1,394 23,740 $471 113 - - - - $1,394
23,740
kWh
$471
113
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,820
Cost:
$450
$1,820 30,774 - - - - - - $1,820
30,774
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$496
Cost:
$500
$496 7,034 - - - - - - $496
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$24,681
Cost:
$8,000
$38,657 655,334 $4,504 1,080 $(-18,480) (-2,981) - - $38,657
655,334
kWh
$4,504
1,080
kW-months/year
$(-18,480)
(-2,981)
MMBtu
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$1,994
Cost:
-
- - - - - - $1,994 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,994
-
$
TOTAL RECOMMENDED Savings:
$33,992
Cost:
$11,584
$44,694 756,155 $5,784 1,387 $(-18,480) (-2,981) $1,994 - $44,694
756,155
kWh
$5,784
1,387
kW-months/year
$(-18,480)
(-2,981)
MMBtu
$1,994
-
$
TOTAL IMPLEMENTED Savings:
$7,491
Cost:
$3,134
$4,217 70,047 $1,280 307 - - $1,994 - $4,217
70,047
kWh
$1,280
307
kW-months/year
-
-
MMBtu
$1,994
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes