IAC logo
IAC Assessment: UF0155
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0155
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1996
Principal Product Metal Clad Building Panels
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 235,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 3,120
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,486 1,939,332 kWh $0.05
Electricity Demand $26,941 5,736 kW-months/year $4.70
TOTAL ENERGY COSTS $166,227
RECOMMENDED SAVINGS* $63,052 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,760
Cost:
$860
$4,760 86,460 - - - - $4,760
86,460
kWh
-
-
kW-months/year
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,464
Cost:
$853
$1,853 33,705 $611 130 - - $1,853
33,705
kWh
$611
130
kW-months/year
-
-
lb
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,362
Cost:
$1,600
$6,362 92,321 - - - - $6,362
92,321
kWh
-
-
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,264
Cost:
$1,300
$5,264 76,202 - - - - $5,264
76,202
kWh
-
-
kW-months/year
-
-
lb
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$10,500
Cost:
$10,500
$10,500 188,746 - - - - $10,500
188,746
kWh
-
-
kW-months/year
-
-
lb
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$902
Cost:
$120
$596 10,844 $306 65 - - $596
10,844
kWh
$306
65
kW-months/year
-
-
lb
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$32,800
Cost:
-
- - - - $32,800 360,000 -
-
kWh
-
-
kW-months/year
$32,800
360,000
lb
TOTAL RECOMMENDED Savings:
$63,052
Cost:
$15,233
$29,335 488,278 $917 195 $32,800 360,000 $29,335
488,278
kWh
$917
195
kW-months/year
$32,800
360,000
lb
TOTAL IMPLEMENTED Savings:
$63,052
Cost:
$15,233
$29,335 488,278 $917 195 $32,800 360,000 $29,335
488,278
kWh
$917
195
kW-months/year
$32,800
360,000
lb
Savings
Cost
$ kWh $ kW-months/year $ lb