IAC logo
IAC Assessment: UF0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1998
Principal Product Steel Storage Equipment
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $5,000,000-$10,000,000
# of Employees 106
Plant Area (Sq.Ft.) 112,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $41,348 857,855 kWh $0.05
Electricity Demand $36,317 3,608 kW-months/year $10.07
Natural Gas $35,764 5,863 MMBtu $6.10
TOTAL ENERGY COSTS $113,429
RECOMMENDED SAVINGS* $50,144 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,497
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,508
Cost:
$582
$772 17,292 $736 71 - - - - $772
17,292
kWh
$736
71
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,287
Cost:
$1,200
$3,874 86,166 $1,413 137 - - - - $3,874
86,166
kWh
$1,413
137
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$4,304
Cost:
$5,200
- - - - $4,304 706 - - -
-
kWh
-
-
kW-months/year
$4,304
706
MMBtu
-
-
$
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$1,194
Cost:
$4,200
$1,194 26,671 - - - - - - $1,194
26,671
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$6,933
Cost:
$11,000
- - - - - - $6,933 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,933
-
$
06: 3.8136 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED Savings:
$14,296
Cost:
$1,175
- - - - - - $14,296 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$14,296
-
$
07: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$5,277
Cost:
$4,000
- - - - - - $5,277 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,277
-
$
08: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,345
Cost:
$920
- - - - - - $11,345 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,345
-
$
TOTAL RECOMMENDED Savings:
$50,144
Cost:
$28,277
$5,840 130,129 $2,149 208 $4,304 706 $37,851 - $5,840
130,129
kWh
$2,149
208
kW-months/year
$4,304
706
MMBtu
$37,851
-
$
TOTAL IMPLEMENTED Savings:
$17,497
Cost:
$16,200
$3,874 86,166 $1,413 137 - - $12,210 - $3,874
86,166
kWh
$1,413
137
kW-months/year
-
-
MMBtu
$12,210
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes