IAC logo
IAC Assessment: UF0216
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0216
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Frozen concentrated orange and grapefruit juice
NAICS n/a
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 350,000
Annual Production 3,875 Thousand Gallons
Production Hrs. Annual 3,384
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $198,810 5,431,419 kWh $0.04
Electricity Demand $27,481 15,351 kW-months/year $1.79
Fuel Oil #6 $308,826 102,260 MMBtu $3.02
TOTAL ENERGY COSTS $535,117
RECOMMENDED SAVINGS* $87,159 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$50,699
Cost:
$251,200
$4,149 112,251 $550 307 - - - - $46,000 - $4,149
112,251
kWh
$550
307
kW-months/year
-
-
$
-
-
MMBtu
$46,000
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$11,441
Cost:
-
- - $4,421 2,470 $7,020 - - - - - -
-
kWh
$4,421
2,470
kW-months/year
$7,020
-
$
-
-
MMBtu
-
-
$
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$6,211
Cost:
-
- - - - - - $7,411 2,454 $(-1,200) - -
-
kWh
-
-
kW-months/year
-
-
$
$7,411
2,454
MMBtu
$(-1,200)
-
$
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$11,243
Cost:
$1,800
- - - - - - - - $11,243 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$11,243
-
$
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$5,200
Cost:
-
- - - - - - - - $5,200 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,200
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,365
Cost:
-
$1,796 64,771 - - - - - - $569 - $1,796
64,771
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$569
-
$
TOTAL RECOMMENDED Savings:
$87,159
Cost:
$253,000
$5,945 177,022 $4,971 2,777 $7,020 - $7,411 2,454 $61,812 - $5,945
177,022
kWh
$4,971
2,777
kW-months/year
$7,020
-
$
$7,411
2,454
MMBtu
$61,812
-
$
TOTAL IMPLEMENTED Savings:
$8,576
Cost:
-
$1,796 64,771 - - - - $7,411 2,454 $(-631) - $1,796
64,771
kWh
-
-
kW-months/year
-
-
$
$7,411
2,454
MMBtu
$(-631)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Administrative Changes Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Administrative Changes