Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 1999 |
Principal Product | Frozen concentrated orange and grapefruit juice |
NAICS | n/a |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $10,000,000-$50,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 350,000 |
Annual Production | 3,875 Thousand Gallons |
Production Hrs. Annual | 3,384 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $198,810 | 5,431,419 | kWh | $0.04 |
Electricity Demand | $27,481 | 15,351 | kW-months/year | $1.79 |
Fuel Oil #6 | $308,826 | 102,260 | MMBtu | $3.02 |
TOTAL ENERGY COSTS | $535,117 | |||
RECOMMENDED SAVINGS* | $87,159 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,576 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $50,699 Cost: $251,200 |
$4,149 | 112,251 | $550 | 307 | - | - | - | - | $46,000 | - |
$4,149 112,251 kWh |
$550 307 kW-months/year |
- - $ |
- - MMBtu |
$46,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $11,441 Cost: - |
- | - | $4,421 | 2,470 | $7,020 | - | - | - | - | - |
- - kWh |
$4,421 2,470 kW-months/year |
$7,020 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS |
Savings: $6,211 Cost: - |
- | - | - | - | - | - | $7,411 | 2,454 | $(-1,200) | - |
- - kWh |
- - kW-months/year |
- - $ |
$7,411 2,454 MMBtu |
$(-1,200) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $11,243 Cost: $1,800 |
- | - | - | - | - | - | - | - | $11,243 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$11,243 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $5,200 Cost: - |
- | - | - | - | - | - | - | - | $5,200 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$5,200 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,365 Cost: - |
$1,796 | 64,771 | - | - | - | - | - | - | $569 | - |
$1,796 64,771 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$569 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $87,159 Cost: $253,000 |
$5,945 | 177,022 | $4,971 | 2,777 | $7,020 | - | $7,411 | 2,454 | $61,812 | - | $5,945 177,022 kWh |
$4,971 2,777 kW-months/year |
$7,020 - $ |
$7,411 2,454 MMBtu |
$61,812 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,576 Cost: - |
$1,796 | 64,771 | - | - | - | - | $7,411 | 2,454 | $(-631) | - | $1,796 64,771 kWh |
- - kW-months/year |
- - $ |
$7,411 2,454 MMBtu |
$(-631) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Fuel Oil #6 | Administrative Changes |