IAC logo
IAC Assessment: UF0221
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0221
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Treated Utility Poles and Marine Pilings
NAICS n/a
SIC 2491 - Wood Preserving
Sales $5,000,000-$10,000,000
# of Employees 25
Plant Area (Sq.Ft.) 1,744,900
Annual Production 1,300,000 Thousand Feet
Production Hrs. Annual 2,808
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $127,841 2,159,144 kWh $0.06
Electricity Demand $33,327 6,726 kW-months/year $4.95
Natural Gas $70,421 13,156 MMBtu $5.35
TOTAL ENERGY COSTS $231,589
RECOMMENDED SAVINGS* $217,555 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $213,783
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,222
Cost:
$2,085
$2,693 45,721 $529 107 - - - - $2,693
45,721
kWh
$529
107
kW-months/year
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$931
Cost:
$1,913
$931 15,826 - - - - - - $931
15,826
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,429
Cost:
$1,800
$1,429 40,445 - - - - - - $1,429
40,445
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,893
Cost:
$8,998
$3,342 56,565 $551 111 - - - - $3,342
56,565
kWh
$551
111
kW-months/year
-
-
$
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$550
Cost:
-
- - $550 111 - - - - -
-
kWh
$550
111
kW-months/year
-
-
$
-
-
$
06: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$1,395
Cost:
-
- - - - - - $1,395 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,395
-
$
07: 3.5317 SELL / OFFER BY-PRODUCT AS ANIMAL FEED Savings:
$18,760
Cost:
-
- - - - $18,760 - - - -
-
kWh
-
-
kW-months/year
$18,760
-
$
-
-
$
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$187,375
Cost:
$44,000
- - - - $187,375 - - - -
-
kWh
-
-
kW-months/year
$187,375
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$217,555
Cost:
$58,796
$8,395 158,557 $1,630 329 $206,135 - $1,395 - $8,395
158,557
kWh
$1,630
329
kW-months/year
$206,135
-
$
$1,395
-
$
TOTAL IMPLEMENTED Savings:
$213,783
Cost:
$56,711
$5,702 112,836 $551 111 $206,135 - $1,395 - $5,702
112,836
kWh
$551
111
kW-months/year
$206,135
-
$
$1,395
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost