IAC logo
IAC Assessment: UF0233
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0233
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Extruded aluminum
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $50,000,000-$100,000,000
# of Employees 470
Plant Area (Sq.Ft.) 470,000
Annual Production 36,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $614,635 18,954,400 kWh $0.03
Electricity Demand $376,529 40,689 kW-months/year $9.25
LPG $10,556 2,340 MMBtu $4.51
TOTAL ENERGY COSTS $1,001,720
RECOMMENDED SAVINGS* $62,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,544
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,146
Cost:
$20,484
$5,023 535,463 $3,123 28 - - - - $5,023
535,463
kWh
$3,123
28
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN Savings:
$1,008
Cost:
$750
$1,008 107,562 - - - - - - $1,008
107,562
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,649
Cost:
$320
$1,649 188,746 - - - - - - $1,649
188,746
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,433
Cost:
$3,905
$3,110 331,770 $4,323 39 - - - - $3,110
331,770
kWh
$4,323
39
kW-months/year
-
-
MMBtu
-
-
$
05: 3.3122 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS Savings:
$10,287
Cost:
$14,925
- - - - $10,287 2,340 - - -
-
kWh
-
-
kW-months/year
$10,287
2,340
MMBtu
-
-
$
06: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$33,600
Cost:
-
- - - - - - $33,600 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$33,600
-
$
07: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$225
Cost:
$210
$90 6,741 $105 - - - $30 - $90
6,741
kWh
$105
-
kW-months/year
-
-
MMBtu
$30
-
$
TOTAL RECOMMENDED Savings:
$62,348
Cost:
$40,594
$10,880 1,170,282 $7,551 67 $10,287 2,340 $33,630 - $10,880
1,170,282
kWh
$7,551
67
kW-months/year
$10,287
2,340
MMBtu
$33,630
-
$
TOTAL IMPLEMENTED Savings:
$46,544
Cost:
$15,995
$2,657 296,308 - - $10,287 2,340 $33,600 - $2,657
296,308
kWh
-
-
kW-months/year
$10,287
2,340
MMBtu
$33,600
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand LPG Administrative Changes Electricity Usage Electricity Demand LPG Administrative Changes