IAC logo
IAC Assessment: UF0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 1999
Principal Product Automotive Parts
NAICS n/a
SIC 3231 - Products Of Purchased Glass
Sales $50,000,000-$100,000,000
# of Employees 490
Plant Area (Sq.Ft.) 280,000
Annual Production 1,645,000 Units
Production Hrs. Annual 5,640
Location (State) FL
View Case Study
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $520,047 12,384,232 kWh $0.04
Electricity Demand $30,944 25,268 kW-months/year $1.22
Natural Gas $51,838 21,674 MMBtu $2.39
TOTAL ENERGY COSTS $602,829
RECOMMENDED SAVINGS* $201,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,658
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,938
Cost:
-
$1,788 45,721 $150 96 - - - - $1,788
45,721
kWh
$150
96
kW-months/year
-
-
lb
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,096
Cost:
-
$857 20,516 $239 35 - - - - $857
20,516
kWh
$239
35
kW-months/year
-
-
lb
-
-
$
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$25,982
Cost:
-
- - - - $25,982 - - - -
-
kWh
-
-
kW-months/year
$25,982
-
lb
-
-
$
04: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$53,580
Cost:
-
- - - - $53,580 - - - -
-
kWh
-
-
kW-months/year
$53,580
-
lb
-
-
$
05: 4.5210 CLEAR AND RENT EXISTING SPACE Savings:
$118,736
Cost:
-
- - - - - - $118,736 - -
-
kWh
-
-
kW-months/year
-
-
lb
$118,736
-
$
TOTAL RECOMMENDED Savings:
$201,332
Cost:
-
$2,645 66,237 $389 131 $79,562 - $118,736 - $2,645
66,237
kWh
$389
131
kW-months/year
$79,562
-
lb
$118,736
-
$
TOTAL IMPLEMENTED Savings:
$80,658
Cost:
-
$857 20,516 $239 35 $79,562 - - - $857
20,516
kWh
$239
35
kW-months/year
$79,562
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes