IAC Assessment: UF0251
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0251
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Meat Products
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 20,000
Annual Production 5,200,000 Pounds
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $70,253 1,678,195 kWh $0.04
Electricity Demand $38,448 2,130 kW-months/year $18.05
Natural Gas $65,035 8,300 MMBtu $7.84
TOTAL ENERGY COSTS $173,736
RECOMMENDED SAVINGS* $158,676 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,736
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$786
Cost:
$440
- - - - $786 100 - - - - -
-
kWh
-
-
kW-months/year
$786
100
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$228
Cost:
$228
$125 2,931 $103 1 - - - - - - $125
2,931
kWh
$103
1
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$6,447
Cost:
$50
- - - - - - - - $6,447 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$6,447
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$863
Cost:
$220
$863 13,189 - - - - - - - - $863
13,189
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$616
Cost:
-
$616 9,379 - - - - - - - - $616
9,379
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE Savings:
$44,000
Cost:
$3,034
- - - - - - $44,000 201,500 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$44,000
201,500
lb
-
-
$
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$940
Cost:
-
- - - - - - $940 44,092 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$940
44,092
lb
-
-
$
08: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$378
Cost:
-
$378 8,499 - - - - - - - - $378
8,499
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$418
Cost:
$280
$47 1,172 $15 2 - - - - $356 - $47
1,172
kWh
$15
2
kW-months/year
-
-
MMBtu
-
-
lb
$356
-
$
10: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$104,000
Cost:
$110,000
- - - - - - - - $104,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$104,000
-
$
TOTAL RECOMMENDED Savings:
$158,676
Cost:
$114,252
$2,029 35,170 $118 3 $786 100 $44,940 245,592 $110,803 - $2,029
35,170
kWh
$118
3
kW-months/year
$786
100
MMBtu
$44,940
245,592
lb
$110,803
-
$
TOTAL IMPLEMENTED Savings:
$53,736
Cost:
$4,252
$2,029 35,170 $118 3 $786 100 $44,000 201,500 $6,803 - $2,029
35,170
kWh
$118
3
kW-months/year
$786
100
MMBtu
$44,000
201,500
lb
$6,803
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes