IAC logo
IAC Assessment: UF0253
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0253
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Metal Enclosures
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 51,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 4,680
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,532 1,414,420 kWh $0.04
Electricity Demand $33,709 3,648 kW-months/year $9.24
Natural Gas $28,945 4,973 MMBtu $5.82
LPG $2,477 128 MMBtu $19.35
TOTAL ENERGY COSTS $128,956
RECOMMENDED SAVINGS* $41,449 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,845
Cost:
$50
- - - - - - - - - - $11,845 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$11,845
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,873
Cost:
$2,282
$5,834 129,543 $2,039 221 - - - - - - - - $5,834
129,543
kWh
$2,039
221
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,296
Cost:
$695
$2,296 38,394 - - - - - - - - - - $2,296
38,394
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,166
Cost:
$320
$3,166 29,894 - - - - - - - - - - $3,166
29,894
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,643
Cost:
-
$1,643 23,740 - - - - - - - - - - $1,643
23,740
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,090
Cost:
$690
- - - - - - - - - - $3,090 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$3,090
-
$
07: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$293
Cost:
-
- - - - - - $293 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$293
-
lb
-
-
$
-
-
$
08: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$565
Cost:
$520
- - - - - - - - $565 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$565
-
$
-
-
$
09: 2.2221 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC Savings:
$10,678
Cost:
$25,000
- - - - $10,678 - - - - - - - -
-
kWh
-
-
kW-months/year
$10,678
-
MMBtu
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,449
Cost:
$29,557
$12,939 221,571 $2,039 221 $10,678 - $293 - $565 - $14,935 - $12,939
221,571
kWh
$2,039
221
kW-months/year
$10,678
-
MMBtu
$293
-
lb
$565
-
$
$14,935
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Administrative Changes