IAC logo
IAC Assessment: UF0258
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0258
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Computer Imaging Systems
NAICS n/a
SIC 3577 - Computer Peripheral Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 165
Plant Area (Sq.Ft.) 60,000
Annual Production 25,000 Pieces
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $80,354 1,766,413 kWh $0.05
Electricity Demand $38,121 4,076 kW-months/year $9.35
TOTAL ENERGY COSTS $118,475
RECOMMENDED SAVINGS* $39,461 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,047
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,278
Cost:
-
$2,309 51,290 $1,969 18 - - $2,309
51,290
kWh
$1,969
18
kW-months/year
-
-
$
02: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$833
Cost:
-
$403 9,086 $430 4 - - $403
9,086
kWh
$430
4
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$414
Cost:
-
$414 9,086 - - - - $414
9,086
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,054
Cost:
-
$268 5,862 $76 1 $710 - $268
5,862
kWh
$76
1
kW-months/year
$710
-
$
05: 2.3112 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS Savings:
$18,176
Cost:
-
- - $18,176 162 - - -
-
kWh
$18,176
162
kW-months/year
-
-
$
06: 3.4155 METER WASTE WATER Savings:
$306
Cost:
-
- - - - $306 - -
-
kWh
-
-
kW-months/year
$306
-
$
07: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$14,400
Cost:
-
- - - - $14,400 - -
-
kWh
-
-
kW-months/year
$14,400
-
$
TOTAL RECOMMENDED Savings:
$39,461
Cost:
-
$3,394 75,324 $20,651 185 $15,416 - $3,394
75,324
kWh
$20,651
185
kW-months/year
$15,416
-
$
TOTAL IMPLEMENTED Savings:
$39,047
Cost:
-
$2,980 66,238 $20,651 185 $15,416 - $2,980
66,238
kWh
$20,651
185
kW-months/year
$15,416
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes