IAC logo
IAC Assessment: UF0261
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0261
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Residential Lighting Fixtures
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 300,000
Annual Production 200,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,781 1,770,516 kWh $0.08
Natural Gas $25,722 3,699 MMBtu $6.95
TOTAL ENERGY COSTS $164,503
RECOMMENDED SAVINGS* $902,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $771,926
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,381
Cost:
$50
- - - - $10,381 - -
-
kWh
-
-
MMBtu
$10,381
-
$
02: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT Savings:
$128,668
Cost:
$650,000
$327,974 4,204,572 $(-190,666) (-27,238) $(-8,640) - $327,974
4,204,572
kWh
$(-190,666)
(-27,238)
MMBtu
$(-8,640)
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,621
Cost:
$1,019
$1,621 20,809 - - - - $1,621
20,809
kWh
-
-
MMBtu
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,873
Cost:
$9,381
$1,873 24,326 - - - - $1,873
24,326
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$793
Cost:
$600
$793 3,810 - - - - $793
3,810
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,774
Cost:
$690
- - $2,774 396 - - -
-
kWh
$2,774
396
MMBtu
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$226
Cost:
-
$226 2,931 - - - - $226
2,931
kWh
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$233
Cost:
$220
$233 3,224 - - - - $233
3,224
kWh
-
-
MMBtu
-
-
$
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$702
Cost:
-
- - - - $702 - -
-
kWh
-
-
MMBtu
$702
-
$
10: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$30,000
Cost:
$413
- - - - $30,000 - -
-
kWh
-
-
MMBtu
$30,000
-
$
11: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$725,196
Cost:
$55,800
$(-24,804) (-317,995) - - $750,000 - $(-24,804)
(-317,995)
kWh
-
-
MMBtu
$750,000
-
$
TOTAL RECOMMENDED Savings:
$902,467
Cost:
$718,173
$307,916 3,941,677 $(-187,892) (-26,842) $782,443 - $307,916
3,941,677
kWh
$(-187,892)
(-26,842)
MMBtu
$782,443
-
$
TOTAL IMPLEMENTED Savings:
$771,926
Cost:
$58,792
$(-21,931) (-287,221) $2,774 396 $791,083 - $(-21,931)
(-287,221)
kWh
$2,774
396
MMBtu
$791,083
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes