IAC Assessment: UF0263
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0263
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2000
Principal Product Residential Lighting Fixtures
NAICS n/a
SIC 3645 - Residential Lighting Fixtures
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 325,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,750
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $145,404 2,185,522 kWh $0.07
TOTAL ENERGY COSTS $145,404
RECOMMENDED SAVINGS* $175,245 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,392
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,876
Cost:
$50
- - $10,876 - -
-
kWh
$10,876
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,224
Cost:
$22,105
$10,224 152,696 - - $10,224
152,696
kWh
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,927
Cost:
$22,821
$4,927 76,788 - - $4,927
76,788
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,095
Cost:
$1,800
$2,095 11,430 - - $2,095
11,430
kWh
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$977
Cost:
-
$977 14,654 - - $977
14,654
kWh
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$12,420
Cost:
-
- - $12,420 - -
-
kWh
$12,420
-
$
07: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$800
Cost:
$1,895
- - $800 - -
-
kWh
$800
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$125,126
Cost:
$20,000
$(-24,874) (-371,336) $150,000 - $(-24,874)
(-371,336)
kWh
$150,000
-
$
09: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$7,800
Cost:
$4,612
- - $7,800 - -
-
kWh
$7,800
-
$
TOTAL RECOMMENDED Savings:
$175,245
Cost:
$73,283
$(-6,651) (-115,768) $181,896 - $(-6,651)
(-115,768)
kWh
$181,896
-
$
TOTAL IMPLEMENTED Savings:
$44,392
Cost:
$28,567
$13,296 178,780 $31,096 - $13,296
178,780
kWh
$31,096
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes