IAC logo
IAC Assessment: UF0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Dimensioned Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 90,000,000 Units
Production Hrs. Annual 5,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $648,593 9,531,396 kWh $0.07
Electricity Demand $210,773 24,132 kW-months/year $8.73
TOTAL ENERGY COSTS $859,366
RECOMMENDED SAVINGS* $3,956,042 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $191,963
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,583
Cost:
$470
$7,637 84,858 - - - - $(-54) - - - $7,637
84,858
kWh
-
-
kW-months/year
-
-
MMBtu
$(-54)
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,473
Cost:
$1,218
$1,181 17,372 $292 3 - - - - - - $1,181
17,372
kWh
$292
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$989
Cost:
-
$989 14,550 - - - - - - - - $989
14,550
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$30,658
Cost:
$15,840
$11,787 173,333 $3,373 32 - - $15,498 - - - $11,787
173,333
kWh
$3,373
32
kW-months/year
-
-
MMBtu
$15,498
-
$
-
-
$
05: 2.7134 USE PHOTOCELL CONTROLS Savings:
$2,476
Cost:
$300
$1,518 22,321 $1,058 10 - - $(-100) - - - $1,518
22,321
kWh
$1,058
10
kW-months/year
-
-
MMBtu
$(-100)
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$16,800
Cost:
$27,000
- - - - - - $16,800 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$16,800
-
$
-
-
$
07: 2.3414 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT Savings:
$1,214,675
Cost:
$4,500,000
$707,200 10,400,000 $209,520 24,132 $(-922,604) (-141,939) $1,220,559 - - - $707,200
10,400,000
kWh
$209,520
24,132
kW-months/year
$(-922,604)
(-141,939)
MMBtu
$1,220,559
-
$
-
-
$
08: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$447,000
Cost:
$990,000
- - - - - - $447,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$447,000
-
$
-
-
$
09: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$1,686,712
Cost:
$272,000
$(-15,756) 231,712 $(-11,671) 111 - - $1,714,139 - - - $(-15,756)
231,712
kWh
$(-11,671)
111
kW-months/year
-
-
MMBtu
$1,714,139
-
$
-
-
$
10: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$15,600
Cost:
$1,200
- - - - - - $15,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,600
-
$
-
-
$
11: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$12,333
Cost:
-
$10,824 159,183 - - - - $578 - $931 - $10,824
159,183
kWh
-
-
kW-months/year
-
-
MMBtu
$578
-
$
$931
-
$
12: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$411,743
Cost:
$9,000
- - - - - - $411,743 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$411,743
-
$
-
-
$
13: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$108,000
Cost:
$900,000
- - - - - - $108,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$108,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,956,042
Cost:
$6,717,028
$725,380 11,103,329 $202,572 24,288 $(-922,604) (-141,939) $3,949,763 - $931 - $725,380
11,103,329
kWh
$202,572
24,288
kW-months/year
$(-922,604)
(-141,939)
MMBtu
$3,949,763
-
$
$931
-
$
TOTAL IMPLEMENTED Savings:
$191,963
Cost:
$944,510
$31,237 431,924 $3,373 32 - - $156,422 - $931 - $31,237
431,924
kWh
$3,373
32
kW-months/year
-
-
MMBtu
$156,422
-
$
$931
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost