IAC logo
IAC Assessment: UF0281
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0281
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Newspaper Printing and Publishing
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 800,000
Annual Production 28,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,852 5,480,400 kWh $0.02
Electricity Demand $117,010 12,354 kW-months/year $9.47
Fuel Oil #2 $1,517 - MMBtu -
TOTAL ENERGY COSTS $235,379
RECOMMENDED SAVINGS* $308,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,433
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ $
01: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$33,061
Cost:
$50,725
$33,061 674,722 - - - - - - $33,061
674,722
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,622
Cost:
$1,402
$1,497 71,280 $1,125 10 - - - - $1,497
71,280
kWh
$1,125
10
kW-months/year
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,786
Cost:
$2,400
$5,786 118,076 - - - - - - $5,786
118,076
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,709
Cost:
$2,520
$2,209 106,872 $1,500 13 - - - - $2,209
106,872
kWh
$1,500
13
kW-months/year
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,886
Cost:
$410
$2,940 60,017 - - $(-54) - - - $2,940
60,017
kWh
-
-
kW-months/year
$(-54)
-
$
-
-
$
06: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$1,597
Cost:
-
$1,597 32,585 - - - - - - $1,597
32,585
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$2,098
Cost:
-
$1,383 65,901 - - $715 - - - $1,383
65,901
kWh
-
-
kW-months/year
$715
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$855
Cost:
$553
$855 40,732 - - - - - - $855
40,732
kWh
-
-
kW-months/year
-
-
$
-
-
$
09: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$19,370
Cost:
$90,464
$18,650 380,616 - - $720 - - - $18,650
380,616
kWh
-
-
kW-months/year
$720
-
$
-
-
$
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$1,800
Cost:
-
- - - - $1,800 - - - -
-
kWh
-
-
kW-months/year
$1,800
-
$
-
-
$
11: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$168,000
Cost:
$240
- - - - - - $168,000 - -
-
kWh
-
-
kW-months/year
-
-
$
$168,000
-
$
12: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$67,200
Cost:
$9,733
- - - - - - $67,200 - -
-
kWh
-
-
kW-months/year
-
-
$
$67,200
-
$
TOTAL RECOMMENDED Savings:
$308,984
Cost:
$158,447
$67,978 1,550,801 $2,625 23 $3,181 - $235,200 - $67,978
1,550,801
kWh
$2,625
23
kW-months/year
$3,181
-
$
$235,200
-
$
TOTAL IMPLEMENTED Savings:
$30,433
Cost:
$94,819
$26,788 610,704 $1,125 10 $2,520 - - - $26,788
610,704
kWh
$1,125
10
kW-months/year
$2,520
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Primary Product Electricity Usage Electricity Demand Administrative Changes Primary Product