IAC Assessment: UF0285
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0285
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2001
Principal Product Corn and Flour Tortillas
NAICS n/a
SIC 2099 - Food Preparations, Nec
Sales $1,000,000-$5,000,000
# of Employees 55
Plant Area (Sq.Ft.) 18,000
Annual Production 10,500,000 Pounds
Production Hrs. Annual 5,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,532 772,779 kWh $0.05
Electricity Demand $18,385 2,138 kW-months/year $8.60
Natural Gas $73,520 11,470 MMBtu $6.41
TOTAL ENERGY COSTS $133,215
RECOMMENDED SAVINGS* $40,812 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes One-time Revenue or Avoided Cost Primary Product
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
01: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,737
Cost:
$624
$1,314 25,266 $423 4 - - - - - - - - - - $1,314
25,266
kWh
$423
4
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,067
Cost:
$1,072
$577 11,092 $490 5 - - - - - - - - - - $577
11,092
kWh
$490
5
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$2,866
Cost:
$3,569
$1,679 32,291 $1,187 12 - - - - - - - - - - $1,679
32,291
kWh
$1,187
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$669
Cost:
$101
$669 12,867 - - - - - - - - - - - - $669
12,867
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
05: 2.2221 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC Savings:
$7,697
Cost:
$25,000
$8,412 161,763 $3,210 31 $(-3,925) (-613) - - - - - - - - $8,412
161,763
kWh
$3,210
31
kW-months/year
$(-3,925)
(-613)
MMBtu
-
-
Tgal
-
-
$
-
-
$
-
-
$
06: 3.4155 METER WASTE WATER Savings:
$778
Cost:
$1,500
- - - - - - $778 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$778
-
Tgal
-
-
$
-
-
$
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$288
Cost:
-
- - - - - - - - - - $288 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
$288
-
$
-
-
$
08: 4.114 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS Savings:
$4,760
Cost:
$2,000
- - - - - - - - - - - - $4,760 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
$
$4,760
-
$
09: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$20,950
Cost:
$11,700
$958 12,600 - - - - - - $19,992 - - - - - $958
12,600
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$19,992
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,812
Cost:
$45,566
$13,609 255,879 $5,310 52 $(-3,925) (-613) $778 - $19,992 - $288 - $4,760 - $13,609
255,879
kWh
$5,310
52
kW-months/year
$(-3,925)
(-613)
MMBtu
$778
-
Tgal
$19,992
-
$
$288
-
$
$4,760
-
$
TOTAL IMPLEMENTED Savings:
$27,445
Cost:
$15,301
$1,627 25,467 - - - - $778 - $19,992 - $288 - $4,760 - $1,627
25,467
kWh
-
-
kW-months/year
-
-
MMBtu
$778
-
Tgal
$19,992
-
$
$288
-
$
$4,760
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes One-time Revenue or Avoided Cost Primary Product Electricity Usage Electricity Demand Natural Gas Water Disposal Personnel Changes One-time Revenue or Avoided Cost Primary Product