IAC logo
IAC Assessment: UF0303
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0303
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Light-Emitting Diodes
NAICS n/a
SIC 3674 - Semiconductors And Related Devices
Sales $5,000,000-$10,000,000
# of Employees 93
Plant Area (Sq.Ft.) 77,000
Annual Production 12,480 Pieces
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,968 11,024,693 kWh $0.05
Electricity Demand $143,321 19,184 kW-months/year $7.47
TOTAL ENERGY COSTS $690,798
RECOMMENDED SAVINGS* $294,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,471
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ gal $ $
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$23,984
Cost:
$1,074
$18,462 384,633 $5,522 62 - - - - $18,462
384,633
kWh
$5,522
62
kW-months/year
-
-
gal
-
-
$
02: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$6,229
Cost:
$358
$6,229 99,984 - - - - - - $6,229
99,984
kWh
-
-
kW-months/year
-
-
gal
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,340
Cost:
$24,092
- - - - - - $5,340 - -
-
kWh
-
-
kW-months/year
-
-
gal
$5,340
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,157
Cost:
$29,907
$10,157 162,864 - - - - - - $10,157
162,864
kWh
-
-
kW-months/year
-
-
gal
-
-
$
05: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$138,554
Cost:
$77,000
$138,554 2,199,273 - - - - - - $138,554
2,199,273
kWh
-
-
kW-months/year
-
-
gal
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$13,509
Cost:
$4,995
$(-1,094) (-22,800) $(-1,022) (-11) $15,625 11,294 - - $(-1,094)
(-22,800)
kWh
$(-1,022)
(-11)
kW-months/year
$15,625
11,294
gal
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$89,796
Cost:
-
- - - - - - $89,796 - -
-
kWh
-
-
kW-months/year
-
-
gal
$89,796
-
$
08: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$7,393
Cost:
-
- - - - - - $7,393 - -
-
kWh
-
-
kW-months/year
-
-
gal
$7,393
-
$
TOTAL RECOMMENDED Savings:
$294,962
Cost:
$137,426
$172,308 2,823,954 $4,500 51 $15,625 11,294 $102,529 - $172,308
2,823,954
kWh
$4,500
51
kW-months/year
$15,625
11,294
gal
$102,529
-
$
TOTAL IMPLEMENTED Savings:
$32,471
Cost:
$29,445
$5,135 77,184 $(-1,022) (-11) $15,625 11,294 $12,733 - $5,135
77,184
kWh
$(-1,022)
(-11)
kW-months/year
$15,625
11,294
gal
$12,733
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Other Liquid (haz) Administrative Changes