IAC logo
IAC Assessment: UF0308
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0308
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Aluminum and Vinyl Windows
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $5,000,000-$10,000,000
# of Employees 120
Plant Area (Sq.Ft.) 74,000
Annual Production 75,000 Pieces
Production Hrs. Annual 5,304
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,093 1,342,968 kWh $0.03
Electricity Demand $19,407 4,322 kW-months/year $4.49
TOTAL ENERGY COSTS $65,500
RECOMMENDED SAVINGS* $30,675 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,465
Cost:
$10,121
$2,009 52,866 $456 8 - - - - $2,009
52,866
kWh
$456
8
kW-months/year
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,612
Cost:
$500
$6,630 125,100 - - $(-18) - - - $6,630
125,100
kWh
-
-
kW-months/year
$(-18)
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,366
Cost:
-
$1,366 25,775 - - - - - - $1,366
25,775
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,184
Cost:
$1,033
$5,184 97,815 - - - - - - $5,184
97,815
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,591
Cost:
$291
$3,105 81,704 - - - - $1,486 - $3,105
81,704
kWh
-
-
kW-months/year
-
-
$
$1,486
-
$
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$5,687
Cost:
$19,500
$5,687 107,311 - - - - - - $5,687
107,311
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$4,770
Cost:
$864
- - - - $4,770 - - - -
-
kWh
-
-
kW-months/year
$4,770
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$30,675
Cost:
$32,309
$23,981 490,571 $456 8 $4,752 - $1,486 - $23,981
490,571
kWh
$456
8
kW-months/year
$4,752
-
$
$1,486
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost