Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2002 |
Principal Product | Aluminum and Vinyl Windows |
NAICS | n/a |
SIC | 3442 - Metal Doors, Sash, And Trim |
Sales | $5,000,000-$10,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 75,000 Pieces |
Production Hrs. Annual | 5,304 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $46,093 | 1,342,968 | kWh | $0.03 |
Electricity Demand | $19,407 | 4,322 | kW-months/year | $4.49 |
TOTAL ENERGY COSTS | $65,500 | |||
RECOMMENDED SAVINGS* | $30,675 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,465 Cost: $10,121 |
$2,009 | 52,866 | $456 | 8 | - | - | - | - |
$2,009 52,866 kWh |
$456 8 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $6,612 Cost: $500 |
$6,630 | 125,100 | - | - | $(-18) | - | - | - |
$6,630 125,100 kWh |
- - kW-months/year |
$(-18) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,366 Cost: - |
$1,366 | 25,775 | - | - | - | - | - | - |
$1,366 25,775 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $5,184 Cost: $1,033 |
$5,184 | 97,815 | - | - | - | - | - | - |
$5,184 97,815 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,591 Cost: $291 |
$3,105 | 81,704 | - | - | - | - | $1,486 | - |
$3,105 81,704 kWh |
- - kW-months/year |
- - $ |
$1,486 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $5,687 Cost: $19,500 |
$5,687 | 107,311 | - | - | - | - | - | - |
$5,687 107,311 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM |
Savings: $4,770 Cost: $864 |
- | - | - | - | $4,770 | - | - | - |
- - kWh |
- - kW-months/year |
$4,770 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $30,675 Cost: $32,309 |
$23,981 | 490,571 | $456 | 8 | $4,752 | - | $1,486 | - | $23,981 490,571 kWh |
$456 8 kW-months/year |
$4,752 - $ |
$1,486 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Administrative Changes | One-time Revenue or Avoided Cost |