IAC Assessment: UF0309
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0309
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2002
Principal Product Precision Metal Parts
NAICS n/a
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 61,000
Annual Production 0 Units
Production Hrs. Annual 3,744
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $111,479 1,867,320 kWh $0.06
Electricity Demand $66,677 7,843 kW-months/year $8.50
TOTAL ENERGY COSTS $178,156
RECOMMENDED SAVINGS* $368,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,160
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,113
Cost:
$340
$8,173 86,031 - - $(-60) - - - - - $8,173
86,031
kWh
-
-
kW-months/year
$(-60)
-
$
-
-
$
-
-
$
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,774
Cost:
$3,840
$1,774 18,669 - - - - - - - - $1,774
18,669
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$9,173
Cost:
$23,719
$6,470 107,832 $2,703 27 - - - - - - $6,470
107,832
kWh
$2,703
27
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$959
Cost:
$256
$959 15,977 - - - - - - - - $959
15,977
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,285
Cost:
-
$663 11,056 - - $63 - $559 - - - $663
11,056
kWh
-
-
kW-months/year
$63
-
$
$559
-
$
-
-
$
06: 3.5131 RECYCLE WHITE WATER Savings:
$334,620
Cost:
$75,000
- - - - - - - - $334,620 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$334,620
-
$
07: 4.448 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$1,560
Cost:
$1,176
- - - - $1,560 - - - - - -
-
kWh
-
-
kW-months/year
$1,560
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,500
Cost:
-
- - - - - - - - $2,500 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$2,500
-
$
09: 4.624 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME Savings:
$8,100
Cost:
$2,160
- - - - $8,100 - - - - - -
-
kWh
-
-
kW-months/year
$8,100
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$368,084
Cost:
$106,491
$18,039 239,565 $2,703 27 $9,663 - $559 - $337,120 - $18,039
239,565
kWh
$2,703
27
kW-months/year
$9,663
-
$
$559
-
$
$337,120
-
$
TOTAL IMPLEMENTED Savings:
$27,160
Cost:
$30,059
$16,417 212,532 $2,703 27 $8,040 - - - - - $16,417
212,532
kWh
$2,703
27
kW-months/year
$8,040
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost