IAC logo
IAC Assessment: UF0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Lumber
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 400,000
Annual Production 48,000 Thousand Feet
Production Hrs. Annual 2,184
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $343,877 10,264,979 kWh $0.03
Electricity Demand $248,767 44,985 kW-months/year $5.53
Wood $1,281 1,095 MMBtu $1.17
TOTAL ENERGY COSTS $593,925
RECOMMENDED SAVINGS* $178,116 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,011
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Wood Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,804
Cost:
-
$1,804 31,650 - - - - - - - - $1,804
31,650
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,190
Cost:
$6,999
$1,686 49,591 $1,504 23 - - - - - - $1,686
49,591
kWh
$1,504
23
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$16,751
Cost:
$9,663
$3,309 97,315 $3,696 56 - - $9,746 - - - $3,309
97,315
kWh
$3,696
56
kW-months/year
-
-
MMBtu
$9,746
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,308
Cost:
$550
$1,356 24,630 - - - - $(-48) - - - $1,356
24,630
kWh
-
-
kW-months/year
-
-
MMBtu
$(-48)
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,686
Cost:
-
$3,686 64,658 - - - - - - - - $3,686
64,658
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,281
Cost:
$971
- - - - $1,281 1,095 - - - - -
-
kWh
-
-
kW-months/year
$1,281
1,095
MMBtu
-
-
$
-
-
$
07: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$38,880
Cost:
$75,000
- - - - - - - - $38,880 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$38,880
-
$
08: 4.4480 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM Savings:
$80,640
Cost:
$337,400
- - - - - - $80,640 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$80,640
-
$
-
-
$
09: 4.4410 INSTALL AUTOMATIC PACKING EQUIPMENT Savings:
$30,576
Cost:
$66,500
- - - - - - $30,576 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,576
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$178,116
Cost:
$497,083
$11,841 267,844 $5,200 79 $1,281 1,095 $120,914 - $38,880 - $11,841
267,844
kWh
$5,200
79
kW-months/year
$1,281
1,095
MMBtu
$120,914
-
$
$38,880
-
$
TOTAL IMPLEMENTED Savings:
$88,011
Cost:
$151,163
$5,113 128,965 $3,696 56 - - $40,322 - $38,880 - $5,113
128,965
kWh
$3,696
56
kW-months/year
-
-
MMBtu
$40,322
-
$
$38,880
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Wood Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Wood Administrative Changes One-time Revenue or Avoided Cost