IAC logo
IAC Assessment: UF0328
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0328
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2003
Principal Product Brake Hoses
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3592 - Carburetors, Pistons, Rings, Valves
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 89,000
Annual Production 15,100,000 Pieces
Production Hrs. Annual 4,375
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,903 3,612,000 kWh $0.03
Electricity Demand $74,364 8,513 kW-months/year $8.74
TOTAL ENERGY COSTS $193,267
RECOMMENDED SAVINGS* $44,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,953
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$10,395
Cost:
-
$10,395 192,500 - - - - - - $10,395
192,500
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,817
Cost:
$12,292
$2,324 70,411 $1,493 176 - - - - $2,324
70,411
kWh
$1,493
176
kW-months/year
-
-
$
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$14,183
Cost:
$11,058
$14,183 262,654 - - - - - - $14,183
262,654
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,810
Cost:
-
$2,505 46,381 - - $205 - $1,100 - $2,505
46,381
kWh
-
-
kW-months/year
$205
-
$
$1,100
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,031
Cost:
-
$2,031 37,606 - - - - - - $2,031
37,606
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,039
Cost:
$5,141
$6,039 111,841 - - - - - - $6,039
111,841
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$3,900
Cost:
$4,000
- - - - $3,900 - - - -
-
kWh
-
-
kW-months/year
$3,900
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$44,175
Cost:
$32,491
$37,477 721,393 $1,493 176 $4,105 - $1,100 - $37,477
721,393
kWh
$1,493
176
kW-months/year
$4,105
-
$
$1,100
-
$
TOTAL IMPLEMENTED Savings:
$23,953
Cost:
$16,292
$17,255 346,898 $1,493 176 $4,105 - $1,100 - $17,255
346,898
kWh
$1,493
176
kW-months/year
$4,105
-
$
$1,100
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost