IAC Assessment: UF0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2004
Principal Product Military Aircrafts
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 259,200
Annual Production 0 Pieces
Production Hrs. Annual 3,952
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $230,191 4,985,520 kWh $0.05
Electricity Demand $59,226 9,420 kW-months/year $6.29
TOTAL ENERGY COSTS $289,417
RECOMMENDED SAVINGS* $121,847 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $80,506
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$48,587
Cost:
$63,488
$27,714 815,120 $20,872 277 - - $27,714
815,120
kWh
$20,872
277
kW-months/year
-
-
lb
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$19,414
Cost:
-
$2,425 71,313 $16,990 225 - - $2,425
71,313
kWh
$16,990
225
kW-months/year
-
-
lb
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$18,795
Cost:
$62,620
$13,172 387,400 $5,623 75 - - $13,172
387,400
kWh
$5,623
75
kW-months/year
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,169
Cost:
$745
$11,169 242,810 - - - - $11,169
242,810
kWh
-
-
kW-months/year
-
-
lb
05: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$7,962
Cost:
$31,000
$5,580 164,112 $2,382 32 - - $5,580
164,112
kWh
$2,382
32
kW-months/year
-
-
lb
06: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$6,140
Cost:
$779
$2,970 87,360 $3,170 42 - - $2,970
87,360
kWh
$3,170
42
kW-months/year
-
-
lb
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,543
Cost:
-
$4,543 133,628 - - - - $4,543
133,628
kWh
-
-
kW-months/year
-
-
lb
08: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,354
Cost:
$11,495
$2,354 51,164 - - - - $2,354
51,164
kWh
-
-
kW-months/year
-
-
lb
09: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$2,883
Cost:
$3,496
- - - - $2,883 - -
-
kWh
-
-
kW-months/year
$2,883
-
lb
TOTAL RECOMMENDED Savings:
$121,847
Cost:
$173,623
$69,927 1,952,907 $49,038 650 $2,883 - $69,927
1,952,907
kWh
$49,038
650
kW-months/year
$2,883
-
lb
TOTAL IMPLEMENTED Savings:
$80,506
Cost:
$94,488
$40,262 1,184,173 $40,244 533 - - $40,262
1,184,173
kWh
$40,244
533
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (haz) Electricity Usage Electricity Demand Solid Waste (haz)