IAC logo
IAC Assessment: UF0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2005
Principal Product cement
NAICS 327310 - Cement Manufacturing
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 115
Plant Area (Sq.Ft.) 250,000
Annual Production 1,300,000 Tons
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,356,505 28,149,217 kWh $0.05
Coal $624,564 205,450 MMBtu $3.04
TOTAL ENERGY COSTS $1,981,069
RECOMMENDED SAVINGS* $80,898 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,112
#|Description Savings
Cost
Status Electricity Usage Coal Solid Waste (haz) Electricity Usage Coal Solid Waste (haz)
$ kWh $ MMBtu $ lb
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$14,486
Cost:
$80,890
$14,486 301,712 - - - - $14,486
301,712
kWh
-
-
MMBtu
-
-
lb
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$21,072
Cost:
$93,200
$21,072 407,424 - - - - $21,072
407,424
kWh
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,438
Cost:
$478
$3,438 71,616 - - - - $3,438
71,616
kWh
-
-
MMBtu
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$23,786
Cost:
-
$23,786 495,540 - - - - $23,786
495,540
kWh
-
-
MMBtu
-
-
lb
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,000
Cost:
$23,755
$5,000 104,160 - - - - $5,000
104,160
kWh
-
-
MMBtu
-
-
lb
06: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$12,491
Cost:
$50,000
- - $12,491 4,109 - - -
-
kWh
$12,491
4,109
MMBtu
-
-
lb
07: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$625
Cost:
$3,496
- - - - $625 - -
-
kWh
-
-
MMBtu
$625
-
lb
TOTAL RECOMMENDED Savings:
$80,898
Cost:
$251,819
$67,782 1,380,452 $12,491 4,109 $625 - $67,782
1,380,452
kWh
$12,491
4,109
MMBtu
$625
-
lb
TOTAL IMPLEMENTED Savings:
$57,112
Cost:
$251,819
$43,996 884,912 $12,491 4,109 $625 - $43,996
884,912
kWh
$12,491
4,109
MMBtu
$625
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Coal Solid Waste (haz) Electricity Usage Coal Solid Waste (haz)