Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2005 |
Principal Product | cement |
NAICS | 327310 - Cement Manufacturing |
SIC | 3241 - Cement, Hydraulic |
Sales | $50,000,000-$100,000,000 |
# of Employees | 115 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 1,300,000 Tons |
Production Hrs. Annual | 8,760 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,356,505 | 28,149,217 | kWh | $0.05 |
Coal | $624,564 | 205,450 | MMBtu | $3.04 |
TOTAL ENERGY COSTS | $1,981,069 | |||
RECOMMENDED SAVINGS* | $80,898 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,112 |
#|Description |
Savings Cost |
Status | Electricity Usage | Coal | Solid Waste (haz) | Electricity Usage | Coal | Solid Waste (haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $14,486 Cost: $80,890 |
$14,486 | 301,712 | - | - | - | - |
$14,486 301,712 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $21,072 Cost: $93,200 |
$21,072 | 407,424 | - | - | - | - |
$21,072 407,424 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,438 Cost: $478 |
$3,438 | 71,616 | - | - | - | - |
$3,438 71,616 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $23,786 Cost: - |
$23,786 | 495,540 | - | - | - | - |
$23,786 495,540 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $5,000 Cost: $23,755 |
$5,000 | 104,160 | - | - | - | - |
$5,000 104,160 kWh |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE |
Savings: $12,491 Cost: $50,000 |
- | - | $12,491 | 4,109 | - | - |
- - kWh |
$12,491 4,109 MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5318 RECYCLE FLUORESCENT LAMPS |
Savings: $625 Cost: $3,496 |
- | - | - | - | $625 | - |
- - kWh |
- - MMBtu |
$625 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $80,898 Cost: $251,819 |
$67,782 | 1,380,452 | $12,491 | 4,109 | $625 | - | $67,782 1,380,452 kWh |
$12,491 4,109 MMBtu |
$625 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,112 Cost: $251,819 |
$43,996 | 884,912 | $12,491 | 4,109 | $625 | - | $43,996 884,912 kWh |
$12,491 4,109 MMBtu |
$625 - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Coal | Solid Waste (haz) | Electricity Usage | Coal | Solid Waste (haz) |