IAC logo
IAC Assessment: UF0356
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0356
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2005
Principal Product Hand and Power Crimping Tools
NAICS 332216 - Saw Blade and Handtool Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 71,200
Annual Production 0 Pieces
Production Hrs. Annual 2,444
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,847 2,080,580 kWh $0.06
Electricity Demand $19,224 5,237 kW-months/year $3.67
TOTAL ENERGY COSTS $143,071
RECOMMENDED SAVINGS* $26,741 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,823
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3113 MAKE ICE DURING OFF PEAK HOURS FOR COOLING Savings:
-
Cost:
$150,000
- - - - -
-
kWh
-
-
kW-months/year
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$11,843
Cost:
$21,108
$11,843 236,861 - - $11,843
236,861
kWh
-
-
kW-months/year
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$6,348
Cost:
$2,000
$6,348 105,803 - - $6,348
105,803
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,008
Cost:
$700
$3,008 50,140 - - $3,008
50,140
kWh
-
-
kW-months/year
05: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$2,918
Cost:
$1,185
$2,352 47,046 $565 13 $2,352
47,046
kWh
$565
13
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,295
Cost:
$2,194
$1,044 20,885 $251 6 $1,044
20,885
kWh
$251
6
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,232
Cost:
$1,450
$1,232 24,632 - - $1,232
24,632
kWh
-
-
kW-months/year
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$96
Cost:
$245
$88 1,752 $9 0 $88
1,752
kWh
$9
0
kW-months/year
09: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
-
Cost:
$3,496
- - - - -
-
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$26,741
Cost:
$182,378
$25,915 487,119 $825 19 $25,915
487,119
kWh
$825
19
kW-months/year
TOTAL IMPLEMENTED Savings:
$23,823
Cost:
$31,193
$23,563 440,073 $260 6 $23,563
440,073
kWh
$260
6
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand