IAC logo
IAC Assessment: UF0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2005
Principal Product Animal cough syrup and animal tablets
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 60,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 2,219
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,599 1,951,720 kWh $0.06
Electricity Demand $35,773 378 kW-months/year $94.64
TOTAL ENERGY COSTS $154,372
RECOMMENDED SAVINGS* $16,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,794
#|Description Savings
Cost
Status Electricity Usage Solid Waste (haz) Increase in Production Electricity Usage Solid Waste (haz) Increase in Production
$ kWh $ lb $ %
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,914
Cost:
$406
$1,914 31,893 - - - - $1,914
31,893
kWh
-
-
lb
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,126
Cost:
$19,754
$7,126 144,283 - - - - $7,126
144,283
kWh
-
-
lb
-
-
%
03: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,567
Cost:
$94,000
$1,567 80,388 - - - - $1,567
80,388
kWh
-
-
lb
-
-
%
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$572
Cost:
$852
$572 19,077 - - - - $572
19,077
kWh
-
-
lb
-
-
%
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$754
Cost:
-
$754 4,416 - - - - $754
4,416
kWh
-
-
lb
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$809
Cost:
$979
$809 5,493 - - - - $809
5,493
kWh
-
-
lb
-
-
%
07: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$459
Cost:
$3,496
- - $459 - - - -
-
kWh
$459
-
lb
-
-
%
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,808
Cost:
$957
- - - - $2,808 - -
-
kWh
-
-
lb
$2,808
-
%
TOTAL RECOMMENDED Savings:
$16,009
Cost:
$120,444
$12,742 285,550 $459 - $2,808 - $12,742
285,550
kWh
$459
-
lb
$2,808
-
%
TOTAL IMPLEMENTED Savings:
$9,794
Cost:
$20,160
$9,794 180,592 - - - - $9,794
180,592
kWh
-
-
lb
-
-
%
Savings
Cost
$ kWh $ lb $ %
Electricity Usage Solid Waste (haz) Increase in Production Electricity Usage Solid Waste (haz) Increase in Production