Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Brake Hose Assemblies
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492 - Fluid Power Valves & Hose Fittings
Sales $10,000,000-$50,000,000
# of Employees 220
Plant Area (Sq.Ft.) 135,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,885
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,315 6,480,002 kWh $0.06
Electricity Demand $77,976 1,083 kW-months/year $72.00
TOTAL ENERGY COSTS $465,291
RECOMMENDED SAVINGS* $92,177 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,316
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Ancillary Material Cost Electricity Usage Administrative Changes Ancillary Material Cost
$ kWh $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,471
Cost:
$1,124
$18,471 307,853 - - - - $18,471
307,853
kWh
-
-
$
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,366
Cost:
-
$1,366 30,354 - - - - $1,366
30,354
kWh
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$13,109
Cost:
$1,327
$13,109 218,478 - - - - $13,109
218,478
kWh
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,178
Cost:
$1,272
$1,178 18,875 - - - - $1,178
18,875
kWh
-
-
$
-
-
$
05: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$15,306
Cost:
$1,300
$15,306 340,128 - - - - $15,306
340,128
kWh
-
-
$
-
-
$
06: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$13,549
Cost:
$36,650
$13,549 225,821 - - - - $13,549
225,821
kWh
-
-
$
-
-
$
07: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$312
Cost:
$3,496
- - - - $312 - -
-
kWh
-
-
$
$312
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$2,448
Cost:
$954
- - - - $2,448 - -
-
kWh
-
-
$
$2,448
-
$
09: 4.4240 IMPROVE SPACE COMFORT CONDITIONING Savings:
$26,438
Cost:
$1,500
- - $26,438 - - - -
-
kWh
$26,438
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$92,177
Cost:
$47,623
$62,979 1,141,509 $26,438 - $2,760 - $62,979
1,141,509
kWh
$26,438
-
$
$2,760
-
$
TOTAL IMPLEMENTED Savings:
$78,316
Cost:
$7,477
$49,430 915,688 $26,438 - $2,448 - $49,430
915,688
kWh
$26,438
-
$
$2,448
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Administrative Changes Ancillary Material Cost Electricity Usage Administrative Changes Ancillary Material Cost