IAC Assessment: UF0376
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0376
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product electronics
NAICS 334111 - Electronic Computer Manufacturing
SIC 3571 - Electronic Computers
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 96,000
Annual Production 1,098 Tons
Production Hrs. Annual 2,805
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $71,793 894,000 kWh $0.08
Electricity Demand $9,802 2,589 kW-months/year $3.79
Natural Gas $28,493 4,512 MMBtu $6.31
TOTAL ENERGY COSTS $110,088
RECOMMENDED SAVINGS* $1,640,205 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,968
Cost:
$27,399
$3,336 48,350 $632 14 - - $3,336
48,350
kWh
$632
14
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,222
Cost:
$2,053
$1,025 14,863 $197 4 - - $1,025
14,863
kWh
$197
4
kW-months/year
-
-
$
03: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$878
Cost:
$2,646
$878 12,719 - - - - $878
12,719
kWh
-
-
kW-months/year
-
-
$
04: 4.6510 INSTALL BACK-UP EQUIPMENT Savings:
$1,632,456
Cost:
$5,315
- - $456 10 $1,632,000 - -
-
kWh
$456
10
kW-months/year
$1,632,000
-
$
05: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,014
Cost:
$3,200
$1,014 14,696 - - - - $1,014
14,696
kWh
-
-
kW-months/year
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$150
Cost:
$1,480
$102 1,477 $48 1 - - $102
1,477
kWh
$48
1
kW-months/year
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$369
Cost:
-
$369 966 - - - - $369
966
kWh
-
-
kW-months/year
-
-
$
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$148
Cost:
-
$148 1,849 - - - - $148
1,849
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$1,640,205
Cost:
$42,093
$6,872 94,920 $1,333 29 $1,632,000 - $6,872
94,920
kWh
$1,333
29
kW-months/year
$1,632,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost