IAC logo
IAC Assessment: UF0388
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0388
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Fruit Juice
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales n/a
# of Employees 64
Plant Area (Sq.Ft.) 81,000
Annual Production 100 Thousand Gallons
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $428,133 5,728,380 kWh $0.07
Electricity Demand $45,122 24,224 kW-months/year $1.86
Natural Gas $110,013 10,019 MMBtu $10.98
TOTAL ENERGY COSTS $583,268
RECOMMENDED SAVINGS* $38,794 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,746
Cost:
$4,846
$5,725 73,280 $21 11 - - $5,725
73,280
kWh
$21
11
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,378
Cost:
$1,688
$4,374 17,148 $4 2 - - $4,374
17,148
kWh
$4
2
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$341
Cost:
$342
$341 4,544 - - - - $341
4,544
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$922
Cost:
$2,346
$922 12,287 - - - - $922
12,287
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$7,286
Cost:
$1,238
- - - - $7,286 662 -
-
kWh
-
-
kW-months/year
$7,286
662
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,957
Cost:
-
$1,957 22,045 - - - - $1,957
22,045
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$193
Cost:
$374
- - - - $193 18 -
-
kWh
-
-
kW-months/year
$193
18
MMBtu
08: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,088
Cost:
$93
$1,088 11,508 - - - - $1,088
11,508
kWh
-
-
kW-months/year
-
-
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,663
Cost:
$1,320
$3,663 48,846 - - - - $3,663
48,846
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7134 USE PHOTOCELL CONTROLS Savings:
$553
Cost:
$240
$546 6,334 $7 4 - - $546
6,334
kWh
$7
4
kW-months/year
-
-
MMBtu
11: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$12,667
Cost:
$65,000
- - - - $12,667 1,153 -
-
kWh
-
-
kW-months/year
$12,667
1,153
MMBtu
TOTAL RECOMMENDED Savings:
$38,794
Cost:
$77,487
$18,616 195,992 $32 17 $20,146 1,833 $18,616
195,992
kWh
$32
17
kW-months/year
$20,146
1,833
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas