IAC logo
IAC Assessment: UF0390
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0390
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Wind turbines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales n/a
# of Employees 106
Plant Area (Sq.Ft.) 394,397
Annual Production 1,000 Pieces
Production Hrs. Annual 7,072
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $468,104 11,571,813 kWh $0.04
Electricity Demand $200,718 19,831 kW-months/year $10.12
TOTAL ENERGY COSTS $668,822
RECOMMENDED SAVINGS* $495,344 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$148,376
Cost:
$619,757
$144,915 2,605,949 $3,461 342 - - $144,915
2,605,949
kWh
$3,461
342
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,981
Cost:
$8,763
$5,885 74,262 $96 10 - - $5,885
74,262
kWh
$96
10
kW-months/year
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$87,992
Cost:
$39,000
$87,992 1,517,100 - - - - $87,992
1,517,100
kWh
-
-
kW-months/year
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$41,661
Cost:
$1,080
$41,661 718,295 - - - - $41,661
718,295
kWh
-
-
kW-months/year
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,722
Cost:
-
$5,722 97,387 - - - - $5,722
97,387
kWh
-
-
kW-months/year
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,951
Cost:
$31,040
$11,951 206,045 - - - - $11,951
206,045
kWh
-
-
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,826
Cost:
$513
$29,826 514,245 - - - - $29,826
514,245
kWh
-
-
kW-months/year
-
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$909
Cost:
$306
$862 8,438 $47 5 - - $862
8,438
kWh
$47
5
kW-months/year
-
-
$
09: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$27,903
Cost:
$20,000
$27,193 472,634 $710 70 - - $27,193
472,634
kWh
$710
70
kW-months/year
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$437
Cost:
$347
$437 10,670 - - - - $437
10,670
kWh
-
-
kW-months/year
-
-
$
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$10,152
Cost:
$36,122
$10,152 247,598 - - - - $10,152
247,598
kWh
-
-
kW-months/year
-
-
$
12: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$4,655
Cost:
$1,610
$4,655 80,256 - - - - $4,655
80,256
kWh
-
-
kW-months/year
-
-
$
13: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$979
Cost:
$4,996
- - - - $979 - -
-
kWh
-
-
kW-months/year
$979
-
$
14: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$118,800
Cost:
$8,400
- - - - $118,800 - -
-
kWh
-
-
kW-months/year
$118,800
-
$
TOTAL RECOMMENDED Savings:
$495,344
Cost:
$771,934
$371,251 6,552,879 $4,314 427 $119,779 - $371,251
6,552,879
kWh
$4,314
427
kW-months/year
$119,779
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost