IAC logo
IAC Assessment: UF0402
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0402
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2007
Principal Product aircrafts parts
NAICS 336411 - Aircraft Manufacturing
SIC 3721 - Aircraft
Sales $100,000,000-$500,000,000
# of Employees 1,372
Plant Area (Sq.Ft.) 500,000
Annual Production 1,300,000 Pieces
Production Hrs. Annual 6,188
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $569,338 10,191,299 kWh $0.06
Electricity Demand $133,568 23,887 kW-months/year $5.59
Natural Gas $267,331 19,083 MMBtu $14.01
TOTAL ENERGY COSTS $970,237
RECOMMENDED SAVINGS* $215,440 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,281
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$29,529
Cost:
$1,827
- - - - $29,529 2,109 - - -
-
kWh
-
-
kW-months/year
$29,529
2,109
MMBtu
-
-
$
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$640
Cost:
$2,320
- - - - $640 46 - - -
-
kWh
-
-
kW-months/year
$640
46
MMBtu
-
-
$
03: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$335
Cost:
$177
$335 5,985 - - - - - - $335
5,985
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,214
Cost:
-
$1,570 28,032 $644 10 - - - - $1,570
28,032
kWh
$644
10
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$64,361
Cost:
$80,399
$62,865 924,624 $1,496 22 - - - - $62,865
924,624
kWh
$1,496
22
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$13,315
Cost:
$57,868
$13,315 237,773 - - - - - - $13,315
237,773
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,641
Cost:
$194
$3,641 65,011 - - - - - - $3,641
65,011
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,006
Cost:
$1,413
$29,006 414,377 - - - - - - $29,006
414,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$38,931
Cost:
$2,136
$38,931 695,190 - - - - - - $38,931
695,190
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,194
Cost:
$390
$2,194 39,174 - - - - - - $2,194
39,174
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,118
Cost:
$1,373
$4,118 73,528 - - - - - - $4,118
73,528
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$2,259
Cost:
$8,400
$1,628 29,084 $631 9 - - - - $1,628
29,084
kWh
$631
9
kW-months/year
-
-
MMBtu
-
-
$
13: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$24,897
Cost:
-
- - - - - - $24,897 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,897
-
$
TOTAL RECOMMENDED Savings:
$215,440
Cost:
$156,497
$157,603 2,512,778 $2,771 41 $30,169 2,155 $24,897 - $157,603
2,512,778
kWh
$2,771
41
kW-months/year
$30,169
2,155
MMBtu
$24,897
-
$
TOTAL IMPLEMENTED Savings:
$33,281
Cost:
$761
$7,740 138,202 $644 10 - - $24,897 - $7,740
138,202
kWh
$644
10
kW-months/year
-
-
MMBtu
$24,897
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes