IAC logo
IAC Assessment: UF0407
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0407
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product soft drinks
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 430,000
Annual Production 20,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,338,036 16,403,519 kWh $0.08
Electricity Demand $273,393 2,694 kW-months/year $101.48
Electricity Fees $230,969 - $ -
Natural Gas $273,966 26,959 MMBtu $10.16
TOTAL ENERGY COSTS $2,116,364
RECOMMENDED SAVINGS* $313,430 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $84,368
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$72,878
Cost:
$27,259
$72,878 736,145 - - - - $72,878
736,145
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,924
Cost:
$9,726
$8,924 90,146 - - - - $8,924
90,146
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,672
Cost:
$762
$17,672 178,489 - - - - $17,672
178,489
kWh
-
-
kW-months/year
-
-
Tgal
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,409
Cost:
-
$17,409 175,857 - - - - $17,409
175,857
kWh
-
-
kW-months/year
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$156,184
Cost:
$102,044
$136,840 1,668,751 $19,344 191 - - $136,840
1,668,751
kWh
$19,344
191
kW-months/year
-
-
Tgal
06: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$7,021
Cost:
-
$7,021 85,616 - - - - $7,021
85,616
kWh
-
-
kW-months/year
-
-
Tgal
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$20,238
Cost:
$21,568
$20,238 204,422 - - - - $20,238
204,422
kWh
-
-
kW-months/year
-
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$13,104
Cost:
$796
- - - - $13,104 262,080 -
-
kWh
-
-
kW-months/year
$13,104
262,080
Tgal
TOTAL RECOMMENDED Savings:
$313,430
Cost:
$162,155
$280,982 3,139,426 $19,344 191 $13,104 262,080 $280,982
3,139,426
kWh
$19,344
191
kW-months/year
$13,104
262,080
Tgal
TOTAL IMPLEMENTED Savings:
$84,368
Cost:
$32,852
$71,264 734,530 - - $13,104 262,080 $71,264
734,530
kWh
-
-
kW-months/year
$13,104
262,080
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal