IAC logo
IAC Assessment: UF0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product insolators and roofing
NAICS 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Units
Production Hrs. Annual 8,760
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $538,997 5,783,782 kWh $0.09
Natural Gas $183,364 17,235 MMBtu $10.64
TOTAL ENERGY COSTS $722,361
RECOMMENDED SAVINGS* $146,787 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,050
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$662
Cost:
$300
$662 7,113 - - $662
7,113
kWh
-
-
MMBtu
02: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$19,825
Cost:
$20,000
- - $19,825 1,870 -
-
kWh
$19,825
1,870
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$7,271
Cost:
$400
$7,271 100,988 - - $7,271
100,988
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$34,736
Cost:
$30,084
$34,736 541,032 - - $34,736
541,032
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$666
Cost:
-
$666 9,248 - - $666
9,248
kWh
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$27,511
Cost:
$182,894
$27,511 256,683 - - $27,511
256,683
kWh
-
-
MMBtu
07: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$648
Cost:
-
$648 6,720 - - $648
6,720
kWh
-
-
MMBtu
08: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$6,290
Cost:
$550
$6,290 87,360 - - $6,290
87,360
kWh
-
-
MMBtu
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$49,178
Cost:
$49,400
$49,178 553,225 - - $49,178
553,225
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$146,787
Cost:
$283,628
$126,962 1,562,369 $19,825 1,870 $126,962
1,562,369
kWh
$19,825
1,870
MMBtu
TOTAL IMPLEMENTED Savings:
$36,050
Cost:
$30,084
$36,050 557,000 - - $36,050
557,000
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas