Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Florida |
---|---|
Assessment Year | 2008 |
Principal Product | playwood |
NAICS | 321212 - Softwood Veneer and Plywood Manufacturing |
SIC | 2435 - Hardwood Veneer And Plywood |
Sales | $50,000,000-$100,000,000 |
# of Employees | 300 |
Plant Area (Sq.Ft.) | 245,000 |
Annual Production | 212,000 Thousand Feet |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,385,552 | 56,090,677 | kWh | $0.08 |
Other Gas | $130,752 | 5,883,676 | MMBtu | $0.02 |
TOTAL ENERGY COSTS | $4,516,304 | |||
RECOMMENDED SAVINGS* | $196,050 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $98,175 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Increase in Production | Electricity Usage | Electricity Demand | Other Gas | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC |
Savings: $950 Cost: $4,000 |
- | - | - | - | $950 | 44,685 | - | - |
- - kWh |
- - kW-months/year |
$950 44,685 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $70,300 Cost: $53,500 |
$70,300 | 938,000 | - | - | - | - | - | - |
$70,300 938,000 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $53,629 Cost: $49,236 |
- | - | - | - | - | - | $53,629 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$53,629 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,217 Cost: - |
$5,217 | 66,886 | - | - | - | - | - | - |
$5,217 66,886 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $5,057 Cost: - |
$5,057 | 57,952 | - | - | - | - | - | - |
$5,057 57,952 kWh |
- - kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $39,189 Cost: $227,490 |
- | - | $39,189 | 502,428 | - | - | - | - |
- - kWh |
$39,189 502,428 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $21,708 Cost: $1,477 |
- | - | $21,708 | 278,310 | - | - | - | - |
- - kWh |
$21,708 278,310 kW-months/year |
- - MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $196,050 Cost: $335,703 |
$80,574 | 1,062,838 | $60,897 | 780,738 | $950 | 44,685 | $53,629 | - | $80,574 1,062,838 kWh |
$60,897 780,738 kW-months/year |
$950 44,685 MMBtu |
$53,629 - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $98,175 Cost: $58,977 |
$75,517 | 1,004,886 | $21,708 | 278,310 | $950 | 44,685 | - | - | $75,517 1,004,886 kWh |
$21,708 278,310 kW-months/year |
$950 44,685 MMBtu |
- - % |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Gas | Increase in Production | Electricity Usage | Electricity Demand | Other Gas | Increase in Production |