IAC logo
IAC Assessment: UF0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product playwood
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2435 - Hardwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 245,000
Annual Production 212,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,385,552 56,090,677 kWh $0.08
Other Gas $130,752 5,883,676 MMBtu $0.02
TOTAL ENERGY COSTS $4,516,304
RECOMMENDED SAVINGS* $196,050 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $98,175
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Increase in Production Electricity Usage Electricity Demand Other Gas Increase in Production
$ kWh $ kW-months/year $ MMBtu $ %
01: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$950
Cost:
$4,000
- - - - $950 44,685 - - -
-
kWh
-
-
kW-months/year
$950
44,685
MMBtu
-
-
%
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$70,300
Cost:
$53,500
$70,300 938,000 - - - - - - $70,300
938,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$53,629
Cost:
$49,236
- - - - - - $53,629 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$53,629
-
%
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,217
Cost:
-
$5,217 66,886 - - - - - - $5,217
66,886
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
05: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,057
Cost:
-
$5,057 57,952 - - - - - - $5,057
57,952
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
%
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,189
Cost:
$227,490
- - $39,189 502,428 - - - - -
-
kWh
$39,189
502,428
kW-months/year
-
-
MMBtu
-
-
%
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,708
Cost:
$1,477
- - $21,708 278,310 - - - - -
-
kWh
$21,708
278,310
kW-months/year
-
-
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$196,050
Cost:
$335,703
$80,574 1,062,838 $60,897 780,738 $950 44,685 $53,629 - $80,574
1,062,838
kWh
$60,897
780,738
kW-months/year
$950
44,685
MMBtu
$53,629
-
%
TOTAL IMPLEMENTED Savings:
$98,175
Cost:
$58,977
$75,517 1,004,886 $21,708 278,310 $950 44,685 - - $75,517
1,004,886
kWh
$21,708
278,310
kW-months/year
$950
44,685
MMBtu
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ %
Electricity Usage Electricity Demand Other Gas Increase in Production Electricity Usage Electricity Demand Other Gas Increase in Production