IAC logo
IAC Assessment: UF0419
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0419
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2009
Principal Product pharmaceuticals
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3851 - Ophthalmic Goods
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 130,000
Annual Production 40,000,000 Pieces
Production Hrs. Annual 6,300
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,550,749 16,982,280 kWh $0.09
Natural Gas $397,396 36,441 MMBtu $10.91
TOTAL ENERGY COSTS $1,948,145
RECOMMENDED SAVINGS* $340,192 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas By-product Production Electricity Usage Natural Gas By-product Production
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$36,890
Cost:
$904
$36,890 405,374 - - - - $36,890
405,374
kWh
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,358
Cost:
-
$2,358 3,240 - - - - $2,358
3,240
kWh
-
-
MMBtu
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,291
Cost:
-
$1,291 14,195 - - - - $1,291
14,195
kWh
-
-
MMBtu
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$490
Cost:
-
$490 6,287 - - - - $490
6,287
kWh
-
-
MMBtu
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,671
Cost:
$3,405
$2,671 - - - - - $2,671
-
kWh
-
-
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$32,995
Cost:
$9,325
$32,995 423,019 - - - - $32,995
423,019
kWh
-
-
MMBtu
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$112,051
Cost:
$1,026
- - $112,051 487,118 - - -
-
kWh
$112,051
487,118
MMBtu
-
-
$
08: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$107,292
Cost:
$42,500
$107,292 1,375,547 - - - - $107,292
1,375,547
kWh
-
-
MMBtu
-
-
$
09: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$41,483
Cost:
$4,000
$41,483 180,359 - - - - $41,483
180,359
kWh
-
-
MMBtu
-
-
$
10: 3.1293 SEPARATE TREATMENTS FOR EACH TYPE OF SOLUTION AND RECYCLE Savings:
$2,671
Cost:
$3,405
- - - - $2,671 - -
-
kWh
-
-
MMBtu
$2,671
-
$
TOTAL RECOMMENDED Savings:
$340,192
Cost:
$64,565
$225,470 2,408,021 $112,051 487,118 $2,671 - $225,470
2,408,021
kWh
$112,051
487,118
MMBtu
$2,671
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas By-product Production Electricity Usage Natural Gas By-product Production