IAC logo
IAC Assessment: UF0426
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0426
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2009
Principal Product bottled water
NAICS 311999 - All Other Miscellaneous Food Manufacturing
SIC 2099 - Food Preparations, Nec
Sales >$500,000,000
# of Employees 217
Plant Area (Sq.Ft.) 9,425,687
Annual Production 975,636,174 Units
Production Hrs. Annual 8,740
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,384,586 32,238,082 kWh $0.07
TOTAL ENERGY COSTS $2,384,586
RECOMMENDED SAVINGS* $872,578 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,083
#|Description Savings
Cost
Status Electricity Usage LPG Increase in Production Electricity Usage LPG Increase in Production
$ kWh $ MMBtu $ %
01: 2.7225 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS Savings:
$20,276
Cost:
$4,000
$20,276 270,348 - - - - $20,276
270,348
kWh
-
-
MMBtu
-
-
%
02: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$146,810
Cost:
$3,192
- - $146,810 68,925 - - -
-
kWh
$146,810
68,925
MMBtu
-
-
%
03: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$328
Cost:
$3,405
- - - - $328 - -
-
kWh
-
-
MMBtu
$328
-
%
04: 2.7145 INSTALL SKYLIGHTS Savings:
$2,555
Cost:
$238
$2,555 23,514 - - - - $2,555
23,514
kWh
-
-
MMBtu
-
-
%
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,764
Cost:
$481
$1,764 17,476 - - - - $1,764
17,476
kWh
-
-
MMBtu
-
-
%
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$50,000
Cost:
$25,000
$50,000 3,800 - - - - $50,000
3,800
kWh
-
-
MMBtu
-
-
%
07: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,382
Cost:
$2,382
$2,382 31,765 - - - - $2,382
31,765
kWh
-
-
MMBtu
-
-
%
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$234,287
Cost:
$67,220
$234,287 2,718,202 - - - - $234,287
2,718,202
kWh
-
-
MMBtu
-
-
%
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,528
Cost:
$628
$3,528 47,041 - - - - $3,528
47,041
kWh
-
-
MMBtu
-
-
%
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,591
Cost:
$568
$6,591 87,873 - - - - $6,591
87,873
kWh
-
-
MMBtu
-
-
%
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$24,539
Cost:
-
$24,539 327,186 - - - - $24,539
327,186
kWh
-
-
MMBtu
-
-
%
12: 2.7141 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS Savings:
$37,500
Cost:
$4,483
$37,500 505,452 - - - - $37,500
505,452
kWh
-
-
MMBtu
-
-
%
13: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$229,898
Cost:
-
$229,898 3,065,303 - - - - $229,898
3,065,303
kWh
-
-
MMBtu
-
-
%
14: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,083
Cost:
-
$1,083 10,742 - - - - $1,083
10,742
kWh
-
-
MMBtu
-
-
%
15: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$111,037
Cost:
$4,000
- - $111,037 52,130 - - -
-
kWh
$111,037
52,130
MMBtu
-
-
%
TOTAL RECOMMENDED Savings:
$872,578
Cost:
$115,597
$614,403 7,108,702 $257,847 121,055 $328 - $614,403
7,108,702
kWh
$257,847
121,055
MMBtu
$328
-
%
TOTAL IMPLEMENTED Savings:
$6,083
Cost:
$866
$6,083 70,555 - - - - $6,083
70,555
kWh
-
-
MMBtu
-
-
%
Savings
Cost
$ kWh $ MMBtu $ %
Electricity Usage LPG Increase in Production Electricity Usage LPG Increase in Production