IAC logo
IAC Assessment: UF0434
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0434
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2010
Principal Product Artificial Knee / Prosthetics
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $100,000,000-$500,000,000
# of Employees 370
Plant Area (Sq.Ft.) 54,755
Annual Production 168,000 Pieces
Production Hrs. Annual 4,290
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $449,967 4,693,120 kWh $0.10
Electricity Demand $99,895 10,824 kW-months/year $9.23
Electricity Fees $64,103 - $ -
TOTAL ENERGY COSTS $615,597
RECOMMENDED SAVINGS* $78,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$3,268
Cost:
$1,893
$3,268 30,258 - - - - - - $3,268
30,258
kWh
-
-
kW-months/year
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,786
Cost:
$4,195
$3,786 35,052 - - - - - - $3,786
35,052
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 2.4227 USE COMPRESSOR AIR FILTERS Savings:
$1,326
Cost:
$210
$1,326 10,120 - - - - - - $1,326
10,120
kWh
-
-
kW-months/year
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,057
Cost:
$401
$1,057 8,069 - - - - - - $1,057
8,069
kWh
-
-
kW-months/year
-
-
lb
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$18,101
Cost:
$4,865
$18,101 138,179 - - - - - - $18,101
138,179
kWh
-
-
kW-months/year
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,388
Cost:
-
$8,388 64,032 - - - - - - $8,388
64,032
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,414
Cost:
$1,926
$1,414 13,092 - - - - - - $1,414
13,092
kWh
-
-
kW-months/year
-
-
lb
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,980
Cost:
$881
$1,620 14,716 $360 36 - - - - $1,620
14,716
kWh
$360
36
kW-months/year
-
-
lb
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,310
Cost:
$20,000
$14,310 109,240 - - - - - - $14,310
109,240
kWh
-
-
kW-months/year
-
-
lb
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,649
Cost:
$232
$1,289 12,271 $360 36 - - - - $1,289
12,271
kWh
$360
36
kW-months/year
-
-
lb
-
-
$
11: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$4,515
Cost:
$7,701
$4,515 41,808 - - - - - - $4,515
41,808
kWh
-
-
kW-months/year
-
-
lb
-
-
$
12: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,125
Cost:
$2,284
$5,125 39,127 - - - - - - $5,125
39,127
kWh
-
-
kW-months/year
-
-
lb
-
-
$
13: 2.7225 CLOSE OUTDOOR AIR DAMPERS DURING WARM-UP / COOL-DOWN PERIODS Savings:
$1,875
Cost:
$10,480
$1,875 14,314 - - - - - - $1,875
14,314
kWh
-
-
kW-months/year
-
-
lb
-
-
$
14: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,568
Cost:
-
- - - - - - $11,568 - -
-
kWh
-
-
kW-months/year
-
-
lb
$11,568
-
$
15: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$571
Cost:
$3,405
- - - - $571 476 - - -
-
kWh
-
-
kW-months/year
$571
476
lb
-
-
$
TOTAL RECOMMENDED Savings:
$78,933
Cost:
$58,473
$66,074 530,278 $720 72 $571 476 $11,568 - $66,074
530,278
kWh
$720
72
kW-months/year
$571
476
lb
$11,568
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes