IAC logo
IAC Assessment: UF0437
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0437
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2010
Principal Product Printed Material
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2759 - Commercial Printing, Nec
Sales $10,000,000-$50,000,000
# of Employees 154
Plant Area (Sq.Ft.) 45,960
Annual Production 2,760,000 Units
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,882 3,869,640 kWh $0.07
Electricity Demand $141,868 10,918 kW-months/year $12.99
Electricity Fees $51,432 - $ -
Natural Gas $49,999 4,320 MMBtu $11.57
TOTAL ENERGY COSTS $515,181
RECOMMENDED SAVINGS* $55,119 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$7,679
Cost:
$4,000
$7,679 71,108 - - - - $7,679
71,108
kWh
-
-
kW-months/year
-
-
$
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$20,263
Cost:
$4,600
$20,263 187,626 - - - - $20,263
187,626
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,562
Cost:
$5,039
$7,066 99,216 $2,496 192 - - $7,066
99,216
kWh
$2,496
192
kW-months/year
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$457
Cost:
-
$301 3,484 $156 12 - - $301
3,484
kWh
$156
12
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,443
Cost:
$4,200
$3,443 47,825 - - - - $3,443
47,825
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,608
Cost:
$469
$1,608 14,891 - - - - $1,608
14,891
kWh
-
-
kW-months/year
-
-
$
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$4,197
Cost:
$1,979
$4,197 38,860 - - - - $4,197
38,860
kWh
-
-
kW-months/year
-
-
$
08: 2.4156 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM Savings:
$3,387
Cost:
$1,200
$3,387 31,369 - - - - $3,387
31,369
kWh
-
-
kW-months/year
-
-
$
09: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$4,523
Cost:
-
- - - - $4,523 - -
-
kWh
-
-
kW-months/year
$4,523
-
$
TOTAL RECOMMENDED Savings:
$55,119
Cost:
$21,487
$47,944 494,379 $2,652 204 $4,523 - $47,944
494,379
kWh
$2,652
204
kW-months/year
$4,523
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes